Similar Projects
Last Updated | 05/23/2023 03:07 AM |
Project Title | District Wide Technology Electrical Package |
Physical Address | View project details and contacts |
City, State (County) | Southgate, MI 48195 (Wayne County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000317014 The RFP consists of electrical demolition and installation projects throughout the Southgate Community School district in preparation for IT & Technology improvements. The scope of work is detailed in the drawings and specs provided by TMP Architects dated March 17th, 2023 and in attachment A2. The Owner desires to commence construction on or before June 20th, 2023 and be substantially complete by August 10th,2023. Scope of work includes providing labor, supervision, materials, permits (if required), tools and equipment necessary to perform the electrical demolition and installation work as described in this RFP along with TMP's drawings dated March 17th, 2023 (attachment A.3) and project specifications (attachment A.4) stated above. Demolition: Disconnect the existing ceiling mounted projector and remove all associated wiring back to source. Ceiling tile to be removed and replaced as required by the Architectural trades. Reuse existing circuit for serving new short throw projector. All general and demolition notes as noted in TMP's bid documents are to be adhered by. Construction: install new two compartment wireways as depicted in TMP's bid documents. Connect 120V receptacle to existing circuit presently serving the removed ceiling projector unless otherwise noted in the drawings. Coordinate exact location with technology contractor prior to installation. All general electrical and construction notes as noted in TMP's bid documents are to be adhered by. Buildings Included in this Project: Allen Elementary School 16500 McCann Ave, Southgate, MI 48195 Anderson High School 15475 Leroy St, Southgate, MI 48195 Grogan Elementary School 13300 Burns St, Southgate, MI 48195 North Pointe Elementary School 18635 Bowie St, Southgate, MI 48195 - Bid Bond 5 % Question Deadline 04/20/2023 at 3:00 PM ET Questions are submitted online No General Requirements - Insurance Required Contact Information Jason Hardy 734-246-4600 ext. 6214 hardyj@sgate.k12.mi.us Contractor Servicesfor District Wide Technology Electrical Improvements at Southgate Community Schools. The Owner desires to commence construction on or before June 20 th , 2023 and be substantially complete by August 10th ,2023. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |