Similar Projects
Alumni House Elevator Modernization
Renovation
Sub-Bidding
$500,000 CJ est. value
Detroit, MI 48202

Industrial Light Fixtures - Electrical Material
Term Contract
Sub-Bidding
Detroit, MI 48226

North Terminal Preconditioned Air Replacement and Electrical Upgrades
Alteration
Post-Bid
Wayne, MI

Electrical Upgrades- HVAC Replacement
Alteration
Post-Bid
Belleville, MI

Generator and Installation for MSP Northville Forensic Lab
Alteration
Results
Northville, MI 48167

CSO Facility Emergency Generator Improvement
Alteration
Results
Dearborn, MI 48120

Wyandotte Municipal Services Power Plant
Alteration
Post-Bid
Wyandotte, MI

Hubbard Manors East and West Ceiling Tile and LED Lighting Installation
Term Contract, Alteration
Results
Dearborn, MI 48126

McNamara Terminal Pre-Conditioned Air and Ground Power Unit Upgrades
Alteration
Post-Bid
Detroit, MI

DRCFA Electrical Material - SEL 351 Relays
Alteration
Results
MI

Lighting Replacement at 6 Sites and Electrical Service Upgrade at Garfield
Alteration
Post-Bid
Livonia, MI

Emergency Generator Replacement For City Of Dearborn Fire Station #3
Alteration
Results
Dearborn, MI

Wayne Terminal Lighting Upgrade
Renovation
Post-Bid
$90,000 CJ est. value
Inkster, MI 48141

Led Lighting Update For Dearborn Ice Skating Center
Alteration
Results
Dearborn, MI

Electric Vehicle Charging Stations - 2022
Alteration
Post-Bid
Detroit, MI 48202

Last Updated 05/23/2023 03:07 AM
Project Title

District Wide Technology Electrical Package

Physical Address View project details and contacts
City, State (County) Southgate, MI 48195   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000317014 The RFP consists of electrical demolition and installation projects throughout the Southgate Community School district in preparation for IT & Technology improvements. The scope of work is detailed in the drawings and specs provided by TMP Architects dated March 17th, 2023 and in attachment A2. The Owner desires to commence construction on or before June 20th, 2023 and be substantially complete by August 10th,2023. Scope of work includes providing labor, supervision, materials, permits (if required), tools and equipment necessary to perform the electrical demolition and installation work as described in this RFP along with TMP's drawings dated March 17th, 2023 (attachment A.3) and project specifications (attachment A.4) stated above. Demolition: Disconnect the existing ceiling mounted projector and remove all associated wiring back to source. Ceiling tile to be removed and replaced as required by the Architectural trades. Reuse existing circuit for serving new short throw projector. All general and demolition notes as noted in TMP's bid documents are to be adhered by. Construction: install new two compartment wireways as depicted in TMP's bid documents. Connect 120V receptacle to existing circuit presently serving the removed ceiling projector unless otherwise noted in the drawings. Coordinate exact location with technology contractor prior to installation. All general electrical and construction notes as noted in TMP's bid documents are to be adhered by. Buildings Included in this Project: Allen Elementary School 16500 McCann Ave, Southgate, MI 48195 Anderson High School 15475 Leroy St, Southgate, MI 48195 Grogan Elementary School 13300 Burns St, Southgate, MI 48195 North Pointe Elementary School 18635 Bowie St, Southgate, MI 48195 - Bid Bond 5 % Question Deadline 04/20/2023 at 3:00 PM ET Questions are submitted online No General Requirements - Insurance Required Contact Information Jason Hardy 734-246-4600 ext. 6214 hardyj@sgate.k12.mi.us Contractor Servicesfor District Wide Technology Electrical Improvements at Southgate Community Schools. The Owner desires to commence construction on or before June 20 th , 2023 and be substantially complete by August 10th ,2023.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents