Similar Projects
MBMV212806 – Repair Warehouse Floor – BLDG 6901
Term Contract
Design
$250,000 to $500,000 est. value
Battle Creek, MI

Rozsa Center Lobby Flooring and Painting
Alteration
Bidding
Houghton, MI

Carpet and Vinyl
Alteration
Bidding
Rogers City, MI

Lobby 1st Floor Hallway Carpet Project
Post-Bid
Sterling Heights, MI 48312

Prairieview Elementary and Minges Brook Elementary School
Post-Bid
Battle Creek, MI 49015

Campus-Wide Flooring Contractors Maintenance Services
Results
Lansing, MI

2019 Floor Maintenance
Results
Corunna, MI

Flooring - Police and Fire Training Center
Alteration
Bidding
Troy, MI 48083

Woods Edge Learning Center Flooring Replacement
Post-Bid
Portage, MI

Webberville Elementary Gym Floor
Results
Webberville, MI

Classroom Flooring Replacement Muskegon Heights - Edgewood
Alteration
Bidding
Muskegon Heights, MI 49444

OCC Auburn Hills Collision Lab Flooring
Post-Bid
Auburn Hills, MI 48326

Carpet Cleaning Services - West Bloomfield Library
Results
Less than $14,010 est. value
West Bloomfield, MI

Carpet and Flooring and Installation
Alteration
Bidding
Ann Arbor, MI 48104

New MS/HS Corridor and Gymnasium Stage Flooring
Post-Bid
Ottawa Lake, MI

Reported 06/10/2021 12:00 AM
Project Title

72--Laminate Wood Flooring Install

Physical Address View project details and contacts
City, State (County) Dollar Bay, MI 49922   (Houghton County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Carpet Area - 1.1 The contractor is to remove all carpet and any necessary padding where it is recommended to be replaced, and dispose of all materials off the USCG property at the contractor expense to an approved disposal site. 1.2 The contractor will repair or replace any damaged or loose tack strips as needed; inspect and repair the subfloor for any loose staples, screws, nails, and etc; identify and report any water, pet staining or odors, or any other abnormal damages that may cause further damage or odors to the USCG POC before continuing work. 1.3 All flooring will need to be cleaned of all loose debris, swept and/or vacuumed, before installing any new materials. 1.4 Install any needed rubber shims to level the carpet with any other flooring in use, and install transitions to areas connecting to different flooring materials. 1.5 Install stain resistant padding where removed and replacement carpet following the manufacturer’s recommendations. Laminate Flooring Install – 1.6 Contractor to take all lower level flooring down to subfloor level if more than two layers are found beneath the existing laminate flooring. 1.7 Contractor will flush cut all flooring along back and side of kitchen base cabinetry if cabinetry is set on top of existing flooring. All flooring removed will be without disturbing the kitchen cabinetry. 1.8 Contractor is to fill any cracks found in subfloor work area and if necessary to level sub-floor in preparation of new laminate flooring installation. 1.9 The specific flooring to be installed is indicated below under materials, this will be provided by the contractor. 1.10 All transition strip required through the unit will matched or be cosmetically appealing with the flooring installed per the local POC discretion if color is not identified below. 1.11 Install area is to include all alcoves, closets and other flooring areas in accordance with the POC guidance upon contractor’s walkthrough for accurate worksite measurements. (Pantry closet and utility rooms) Minimal use of transitional strips is required per contract, if flooring can be floated through multiple rooms then install will be completed in this manner. 1.12 All laminate for this housing site will be rolled laminate glue down flooring with full glue installation.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents