Similar Projects
Riverhill Elementary Drainage Project
Infrastructure
Bidding
Temple Terrace, FL 33617

Edward Medard Toe Drain Replacement
Renovation
Bidding
Plant City, FL 33567

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Pipe Cleaning Drainage Systems
Results
Less than $65,000 est. value
FL

Sports Field Drainage Project, Tournament Sportsplex
Results
Tampa, FL 33619

Trench Drain System
Infrastructure
Post-Bid
Tampa, FL

Structures - S-160 and S-163 Gate Refurbishment Support
Results
$500,000 to $999,000 est. value
Tampa, FL 33610

Drainage Project of Lake Magdalene and Roosevelt Elementary Schools
Term Contract
Post-Bid
Tampa, FL 33612

Public Safety Operations Complex Pond Maintenance
Results
Less than $200,000 est. value
Tampa, FL 33619

2018 Kracker Avenue Restoration Project
Results
Less than $1,458,007 est. value
Gibsonton, FL 33534

Hillsborough River Dam North Embankment Remediation
Results
$517,080 est. value
FL

Grading - Gibsonton Tract Mitigation Site
Infrastructure
Results
$3,159,800 est. value
FL

Drainage In Field Corridors, Tournament Sportsplex
Infrastructure
Results
Tampa, FL 33619

Grading - US 92 - Drainage Improvements
Infrastructure
Results
$3,693,800 est. value
Seffner, FL 33584

Last Updated 01/25/2022 05:38 PM
Project Title

Edward Medard Dam Discharge and Spillway Rehabilitation

Physical Address View project details and contacts
City, State (County) Plant City, FL 33567   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All required work necessary to repair four joints within the existing discharge culvert, make general concrete repairs within the existing discharge culvert, and installation of a stop plate within the intake tower at Edward Medard Dam.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents