Similar Projects
2019 / 2020 Snow Removal & Drivers
Post-Bid
Easton, PA

Residential Solid Waste and Recycling Collection, Disposal and Processing Contract
Term Contract
Post-Bid
East Bangor, PA

Refuse and Recycling
Post-Bid
East Bangor, PA

Soil Disposal at 35 LUKOIL Stations in NY, NJ & PA
Term Contract
Post-Bid

Soil Disposal at 35 LUKOIL Service Station
Term Contract
Post-Bid

Wastewater Treatment Plant Sludge Removal Project
Post-Bid
Pen Argyl, PA 18072

Snow & Ice Removal - Easton PA
Post-Bid
Easton, PA

Recyclable Materials Accepting, Processing, Marketing and Compensating The Borough
Term Contract
Post-Bid
Walnutport, PA 18088

Collection of Municipal Waste and Recycling
Post-Bid
Bath, PA 18014

Landfill/Transfer Station Services
Term Contract
Post-Bid
Hellertown, PA 18055

Pick-Up, Transportation and Disposal of Municipal Solid Waste and the Transportation, Disposal of Recyclable Material
Term Contract
Post-Bid
Walnutport, PA 18088

Mixed Scrap Metal Removal and Recycling
Term Contract
Post-Bid

Snow Removal Services
Post-Bid
Bethlehem, PA 18018

Collection of Recyclable Materials
Post-Bid
Hellertown, PA 18055

WWTP Screenings Disposal Contract
Term Contract
Post-Bid
Bethlehem, PA 18015

Reported 06/13/2020 12:00 AM
Project Title

Disposal, Loading and Hauling of Digested Sludge

Physical Address View project details and contacts
City, State (County) Bangor, PA 18013   (Northampton County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide a 30 cu. yd. roll-off dumpster to fit under the conveyor system at the Wastewater Treatment Plant. The dumpster will be filled by the conveyor system and Contractor shall be responsible for loading dumpster on to the contractors truck and transporting the material to the appropriate locations(s) for disposal. Dumpster shall be suitable to haul sewage sludge at 20 percent solids. Contractor shall provide all material, labor, and equipment necessary to transport and dispose of dewatered sludge. Contract Period: July 1, 2020 thru June 30, 2023

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents