Similar Projects
Cottonwood Drive and Potters Lane Infrastructure Improvements
Infrastructure
Bidding
$700,000 est. value
Clarksville, IN

Pavement Patching
Infrastructure
Bidding
$4,000,000 est. value
Charlestown, IN

2021 Community Crossings Grant Funded Street Paving
Post-Bid
Sellersburg, IN

2021 Community Crossings Grant Funded Street Paving
Post-Bid
Charlestown, IN

2021 Pavement Repair
Results
Jeffersonville, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Utica-Sellersburg Road Improvements from SR 62 to Railroad Tracks
Post-Bid
Jeffersonville, IN

Asphalt Resurface
Infrastructure
Results
IN

2021 Jeffersonville Milling, Paving, Base Repair and Patching of Various City Streets
Post-Bid
Jeffersonville, IN

Partol Road Rehabilitation Phase 1
Infrastructure
Results
Jeffersonville, IN 47190

Community Park Amphitheater & Access Drive
Post-Bid
$80,000 est. value
Borden, IN

Public Works Facility Intersection Improvements
Infrastructure
Results
Clarksville, IN 47129

Street Repair and Paving
Post-Bid
Clarksville, IN

2021-2 Community Crossings Grant Funded Street Paving
Infrastructure
Results
Charlestown, IN

South Clarksville Street Construction
Infrastructure
Post-Bid
Clarksville, IN

Last Updated 07/20/2022 01:37 AM
Project Title

CCMG Street Milling, Paving, Base Repair and Patching of Various City Streets

Physical Address View project details and contacts
City, State (County) Jeffersonville, IN   (Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $540,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STREETS TO BE RESURFACED: a. 8th St (From Cherry Dr to Main St ) b. Augusta Dr (From Charlstown Jeffersonville Pike to Hamburg Pike ) c. Bess Court (From James Drive to Cul-De Sac) d. Blueberry Way (From Capitol Hills Dr to Harvest Ct ) e. BrookHollow Way (From Utica Sellersburg Rd to Brookview Dr ) f. Crestview Ct (From 8th St to Park Place ) g. Jefferson St (From Market St to High St ) h. Locust St (From E Chestnut to E Maple St ) i. Locust St (From E Chestnut to Market St ) j. Locust St (From Riverside Dr to Market St ) k. 10th Street From Allison Lane to Thompson Lane l. Nachand Lane (From 10th St to 8th St ) m. New Chapel Rd (From Utica Sellersburg Rd to Kerry Ann Way ) n. 8th St (From Chippewwa Dr. East to Ewing Lane ) o. Akers Ave (From Sparks St to 14th St ) p. Charlestown Pike (From Hamburg Pike to Tall Oaks Drive ) q. Heritage Heights Way (From New Chapel Rd to Mackenzie Dr ) r. Heritage Heights Way (From Bluesky Loop to Mackenzie Dr ) s. Horizon Way (From Salem Nooble Rd to sky Ridge Rd. ) t. Sky Ridge Rd (From Horizon Way to Sky Crest Court ) u. Northern Lights Drive (From Salem Noble to Clarks View Dr ) v. Utica Pke (From Port Rd to Loop Rd ) w. Hidden Lake Blvd (From Coopers Lane to Lakes Vista ) x. James Drive (From Ewing Ln to Winburn Ave ) y. 8th Street (From Wall St to Walnut St ) z. W 15th St (From Duncan St to Spring St ) aa. Watt St (From 8th St to Court Ave ) bb. E Chestnut (From Spring St to Wall St ) cc. Charlestown Ave (From Main St to Division St ) This project includes milling, resurfacing, patching and base repair of asphalt and concrete streets, replacement of non-ADA compliant curb ramps and sidewalk, replacement of curb, replacement of traffic signal detection loops, drainage work, pavement markings, and all other necessary items to result in a complete project. The bids shall be Unit Price for all work shown in the contract documents and specifications with unit prices for extras as detailed in the Instructions to Bidders in the specifications and submitted in duplicate on the State Board of Accounts Form No. 96. An executed State Board of Accounts Form 96a or similar document shall be required. As a requirement of the Community Crossings Grant funding utilized for this project, the prime contractor to whom the work is awarded must be prequalified with INDOT. Subcontractors can enter into subcontracts up to $300,000 without being prequalified with INDOT; however, the subcontractor is limited to a total of $300,000 in unearned work under contract on any given date with any owner, contractor, or other party. The Contract Documents are on file for public inspection at the Jeffersonville Street Department at 2003 Renfroe Way, Jeffersonville, Indiana 47130 The Board of Public Works of the City of Jeffersonville, Indiana, reserves the right to reject any and all bids and to waive informalities in bidding. All sealed bids shall be turned in to the office of the City Clerk, Suite 156, First Floor, Jeffersonville City Hall, 500 Quartermaster Court, Jeffersonville, Indiana. Bids shall be turned in no sooner than 12:00 p.m. and no later than 2:00 p.m. on the 1st day of June, 2022. The Board of Public Works of the City of Jeffersonville, Indiana, reserves the right to reject any and all bids and to waive informalities in bidding.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents