Similar Projects
Heat Pump Replacements at John Griffin Middle School
Bidding
Fayetteville, NC 28304

Heat Pump Replacements at MAC Williams Middle School
Bidding
Fayetteville, NC 28312

Bypass Pumping Service
Post-Bid
Charlotte, NC

2016 Water System Improvements, Contract No. 14 - Well No. 65-CH and Well No. 66-PD
Post-Bid
Washington, NC

Monitoring Well Installation at Merchants Millpond State Park
Results
NC

Construct Tanker Truck Delivery System
Results
$10,000,000 to $25,000,000 est. value
Goldsboro, NC

New Raw Water Main and Well Enclosure
Bidding
Newport, NC 28570

Dewatering Pump Rental
Term Contract
Post-Bid
Raleigh, NC

Dixon Well Sites D10 and D11 Phase 2
Results
Holly Ridge, NC

Test and Production Wells 3 and 4
Bidding
Lake Waccamaw, NC 28450

Floodwater Dewatering Pump Rental and Operations
Term Contract
Post-Bid
Nags Head, NC

East Lake Operations Center Water Treatment Upgrade
Results
Less than $25,000 est. value
East Lake, NC

River Pump Motor, Removal and Installation
Bidding
Halifax, NC 27887

Pump and Motor Repair Service
Post-Bid
Monroe, NC

Saline Well Repair With Pump Replacement - Edenton NFH, NC
Results
Edenton, NC

Reported 01/07/2019 11:46 AM
Project Title

Water Supply Well #28

Physical Address View project details and contacts
City, State (County) Aberdeen, NC 28315   (Moore County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The Project includes the construction of a new water supply well system to include pumps, piping, new well house, chemical feed system, electrical improvements, approximately 375 LF 6" water main, site work, security fencing, access drive and all related appurtenances as described within the contract documents and detailed drawings. The production well, casing and screens have been installed and developed in accordance with the approved NCDEQ permit.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents