Similar Projects
Last Updated | 10/22/2021 08:01 AM |
Project Title | Guardrail Installation and Repair |
Physical Address | View project details and contacts |
City, State (County) | (Avery, Caldwell, Watauga Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1 Sp Mobilization 50 Ea 2 Sp Mobilization - Emergency 25 Ea 3 Sp Steel Beam Guardrail, (Rail Only) 3,000 Lf 4 Sp Steel Beam Guardrail, Shop Curved (Rail Only) 100 Lf 5 Sp Steel Beam Guardrail – New Installation 500 Lf 6 Sp Strong Post Corrugated Beam Guardrail 100 Lf 7 Sp Additional Guardrail Posts 300 Ea 8 Sp Additional Guardrail Post For Guardrail Anchor Unit (Breakaway) 100 Ea 9 Sp Extra Length Guardrail Posts – 9’-0” 100 Ea 10 Sp Strong Post Corrugated Beam Guardrail – Extra Length Post 5 Ea 11 Sp Additional Composite Blocks 400 Ea 12 Sp Weak Post Guardrail (Post Only) 25 Ea 13 Sp Guardrail Anchor Unit, Type b-77 2 Ea 14 Sp Guardrail Anchor Unit, Type b-83 2 Ea 15 Sp Guardrail Anchor Unit, Type Iii 2 Ea 16 Sp Guardrail Anchor Unit, Type Iii Modified 5 Ea 17 Sp Guardrail End Unit, Type Tl-3 35 Ea 18 Sp Guardrail End Unit, Type Tl-2 5 Ea 19 Sp Guardrail End Unit, Buried In Cut 5 Ea 20 Sp Guardrail End Unit, (Remove & Reset) 5 Ea 21 Sp End Section Assembly Only For Tl-3 & Tl-2 20 Ea 22 Sp Guardrail End Unit, Median 5 Ea 23 Sp Impact Attenuator Unit- Type Tl-3 5 Ea 24 Sp Guardrail Anchor Unit, Type Cat-1 5 Ea 25 Sp Guardrail Anchor Unit, Type At-1 5 Ea 26 Sp Buffered End Section For Cat-1 & At-1 5 Ea 27 Sp Steel Beam Guardrail Terminal Sections 5 Ea 28 Sp Typical End Shoe 5 Ea 29 Sp Triple Corrugated Steel Beam Guardrail 50 Lf 30 Sp End Shoe (Thrie Beam) 2 Ea 31 Sp w-Tr Steel Beam Guardrail Transition Sections 4 Ea 32 Sp Replace Guardrail End Delineation 5 Ea 33 Sp Replace Guardrail Delineation 100 Ea 34 863 Remove Existing Guardrail 100 Lf 35 864 Remove And Reset Existing Guardrail 200 Lf 36 Sp Weathering Steel Beam Guardrail 100 Lf 37 Sp Weathering Steel Beam Guardrail (Rail Only) 50 Lf 38 Sp Weathering Steel Beam Guardrail, Shop Curved 25 Lf 39 Sp Powder Coated Galvanized Steel Beam Guardrail 100 Lf 40 Sp Powder Coated Galvanized Steel Beam Guardrail, Shop Curved 25 Lf 41 Sp Powder Coated Galvanized Guardrail Anchor Units, Type Tl-3 1 Ea 42 Sp Powder Coated Galvanized Guardrail Anchor Units, Type Tl-2 1 Ea 43 Sp Powder Coated Galvanized Guardrail Anchor Units, Type Cat-1 1 Ea 44 Sp Powder Coated Galvanized Guardrail Anchor Units, Type b-83 1 Ea 45 Sp Powder Coated Galvanized Guardrail Additional Guardrail Posts 1 Ea 46 Sp Powder Coated Galvanized Guardrail Additional Guardrail Posts, Extra Length 9’-0” 1 Ea 47 Sp Traffic Control, Full Lane Closure Divided Hwy. 50 Ea |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |