Similar Projects
Jaycee Park Parking Improvements
Infrastructure
Bidding
$1,100,000 CJ est. value
Hattiesburg, MS 39401

Jaycee Park Parking Improvements
Infrastructure
Bidding
$1,100,000 CJ est. value
Hattiesburg, MS 39401

Forrest County Overlay
Infrastructure
Post-Bid
MS

RTI Track Widening and Overlay
Infrastructure
Post-Bid
Camp Shelby, MS

Country Club Road Reconstruction
Infrastructure
Results
$1,947,200 est. value
Hattiesburg, MS

Mill and Overlay approximately 1 mile on US 11 from Bouie Street to the Leaf River Bridge and Level and Overlay approximately 2 miles on SR 42 from the end of the 4-lane Section to the Perry County Line
Infrastructure
Results
MS

Tuscan Sewer Project - City of Hattiesburg
Infrastructure
Pending Verification
$600,000 CJ est. value
Hattiesburg, MS 39401

Lillie Burney Neighborhood Sidewalk Project - City of Hattiesburg
Infrastructure
Pending Verification
$237,000 CJ est. value
Hattiesburg, MS 39401

Jaycee Park Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Hattiesburg, MS 39401

Countywide Reseal on roads A through J
Infrastructure
Post-Bid
MS

Pavement Restoration
Infrastructure
Results

Repair and Rehabilitation of City Streets
Infrastructure
Post-Bid
Hattiesburg, MS

Hall Avenue East Project
New Construction
Results
Hattiesburg, MS 39401

Highway 42 Overlay
Infrastructure
Post-Bid
Hattiesburg, MS

Placement of Stripe and Raised Pavement Markers
Infrastructure
Results

Last Updated 11/04/2022 02:04 PM
Project Title

Grace Avenue Bridge Replacement - City of Hattiesburg

Physical Address View project details and contacts
City, State (County) Hattiesburg, MS 39401   (Forrest County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Grace Avenue Bridge Replacement As of November 4, 2022, this project is in design. A timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents