Last Updated | 04/28/2022 09:56 AM |
Project Title | SC 987 Improvements to Return Sludge Pumping Station No. 2 at The Patapsco Wastewater Treatment Plant |
Physical Address | View project details and contacts |
City, State (County) | Baltimore, MD (Baltimore City County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $10,000,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove and replace existing RAS pumps, discharge control valve, suction and discharge isolation discharge, electrical support devices, and all associated appurtenance within Return Sludge Pumping Station No. 2 (RSPS2). Provide new RAS pumps, check valves, suction and discharge isolation valves with electric actuators, variable frequency drives, and piping modification necessary to integrate new components. Integration of RAS system into the Plant Distributed Control System. Remove and replace existing WAS pumps, suction and discharge isolation valves, magmeters, electrical support devices, and all associated appurtenances within Return Sludge Pumping Station No. 2 (RSPS2). Provide new WAS pumps, check valves, suction and discharge isolation valves with electric actuators, variable frequency drives, and piping modification necessary to integrate new components. Integration of WAS system into the Plant Distributed Control System. Replacement of the polymer system, including wiring and integration onto the Plant Distributed Control System. Replacement of the sludge room and chemical room sump pump systems. Removal of existing dewatering pump systems. Cleaning and abandonment of the existing ferric chloride systems. Removal of Distribution Box aeration piping and diffuser system. Replacement of Distribution Box electric actuators and associated controls. Plumbing improvements to locker room drainage pipe replacement, replacement of existing eyewash and shower stations, and replacement of water supply piping. Ventilation improvements within the electrical and controls room. Roof inspection and repair in accordance with third party inspection report. Replacement of exterior personnel doors. Replacement of lighting. Structural, Electrical, and Instrumentation |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Water Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |