Similar Projects
Removal and Replacement of Concrete Curb and Sidewalk Countywide
Term Contract
Bidding
Rockville, MD 20850

Hagerstown Cultural Trail Phase 2 and Urban Improvement Project Plaza
Bidding
Hagerstown, MD 21740

Concrete Curbs and Sidewalks Construction at Various Locations
Post-Bid
$2,500,001 to $5,000,000 est. value
MD

ADA Upgrades - Walker Mill and Mt Rainer
Post-Bid
Upper Marlboro, MD 20772

Portland Cement Concrete Repairs
Term Contract
Results
$184,840 est. value
Baltimore, MD

Vienna Town Hall ADA Building and Property Improvements
Results
$49,884 est. value
Vienna, MD

Replacement and Repairs of Sidewalk and Americans With Disabilities Act (ADA) Ramps (FY2022)
Bidding
Frederick, MD

Parking Lot Repairs – 125 Virginia Avenue
Post-Bid
Cumberland, MD 21501

Urgent Need Contract Citywide
Results
$1,000,000 to $2,000,000 est. value
Baltimore, MD

Longfield Drainage Improvements
Bidding
$2,500,001 to $5,000,000 est. value
Forestville, MD 20747

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Baltimore, Clinton, Hagerstown, La Vale, New Carrollton, Oakland, Upper Marlboro, MD

Parking Lot A Improvements and Northern Trail Extension
Term Contract
Results
Less than $180,097 est. value
Bel Air, MD

Alterations and Additions Riverdale Park Municipal Center Project
Renovation, Addition - 670 SF
Bidding
Riverdale Park, MD 20737

Asphalt Resurfacing and Related Roadway Improvements – 5 Contracts
Post-Bid
$5,000,001 to $10,000,000 est. value
MD

Parking Expansion Charles H. Chipman Elementary School
Results
Salisbury, MD 21801

Last Updated 02/13/2020 08:34 AM
Project Title

Koon Dam Sidewalk Repairs- Phase 3

Physical Address View project details and contacts
City, State (County) Cumberland, MD 21502   (Allegany County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes: 1.Replacement of approximately 90 lineal feet of open overhang sidewalk on the northerly side of the two northeastern spans of the Koon Dam Bridge; 2.Replacement of approximately 25 lineal feet of enclosed sidewalk in front of the gatehouse on the northly side of the Koon Dam Bridge; 3.Approximately 30 square feet of surficial concrete repairs to the substructure of the northerly side of the two northeastern spans of the Koon Dam Bridge. 4.The Contractor shall be responsible for obtaining a Highway Occupancy Permit (Form M?945P) from the Pennsylvania Department of Transportation. Notice to proceed on this project shall be issued once the permit has been approved.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents