Similar Projects
Menomonie Housing Authority Fire Alarm Project
Renovation
Sub-Bidding
$200,000 CJ est. value
Menomonie, WI 54751

Fire Sprinkler System Inspections & Repairs
Term Contract
Post-Bid
WI

Various Work Items for Phase 4A Townhomes (Westlawn Renaissance VII) at Westlawn Gardens Phase 2
Alteration
Post-Bid
Milwaukee, WI

Brookside Care Center Fire Protection Piping Replacement
Alteration
Results
Kenosha, WI 53144

Engineering Hall Sprinkler and Gas Piping-Phase 1 - GPC
Infrastructure, Alteration
Results
$3,500,000 est. value
Madison, WI 53706

Fire Alarm Upgrade - Milwaukee Secure Detention Facility
Renovation
Construction
$232,500 CJ est. value
Milwaukee, WI 53233

Fire Alarm Replacement
Renovation
Construction
$154,000 CJ est. value
Madison, WI 53715

La Crosse Medical Health Science Center Fire Alarm Upgrade
Alteration
Post-Bid
$650,000 est. value
La Crosse, WI 54601

Multi-Building Fire Safety
Alteration
Results
$251,000 est. value
Menomonie, WI 54751

City of Sheboygan Mead Public Library Fire Alarm System Upgrade
Alteration
Post-Bid
$200,000 est. value
Sheboygan, WI 53081

Fire Alarm Upgrade
Alteration
Results
$2,375,500 est. value
Sturtevant, WI 53177

Tomah VA Fire Department Full Service Preventative Maintenance at the Tomah VAMC
Alteration
Post-Bid
Tomah, WI 54660

Downtown Milwaukee Campus(DMC) - Student Center Atrium Improvements
Alteration
Results
$300,000 est. value
Milwaukee, WI 53233

Fire Suppression Inspections and Repairs
Term Contract
Post-Bid
Oshkosh, WI

Downtown Main Campus (DMC) Fire Protection Improvements FH 5-8
Alteration
Results
$750,000 est. value
Milwaukee, WI 53203

Last Updated 07/12/2023 03:27 PM
Project Title

Fire Alarm and Detection Device Replacement

Physical Address View project details and contacts
City, State (County) Appleton, WI 54911   (Outagamie County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $15,515 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace (Quantity of 60) FSP-951 smoke detectors Remove and replace (Quantity of 15) FST-951R heat detectors Remove and replace (Quantity of 8) bulk packs of B300-6-BP detector bases Remove and replace (Quantity of 15) NBG-12LX manual pull stations Remove and replace (Quantity of 5) FMM-1 monitor modules Remove and replace (Quantity of 5) FRM-1 relay modules Remove and replace (Quantity of 3) ISO-X Isolation modules 1. Work can be performed during normal business hours Mondays through Fridays excluding County observed holidays. 2. Contractor shall replace devices as they are removed so the system can be re- enabled at the end of each day. All devices shall be installed to manufactures recommendations and specifications. 3. Program fire alarm system as needed to accept and recognize new devices. 4. Contractor shall test each device and the system at the completion of the project to assure all devices are working as required. 5. Existing wiring to devices shall remain. Contractor is not responsible for replacing wiring to devices. 6. Contractor shall take care not to damage surfaces such as walls, ceiling and floors, however contractor will not be responsible for patching and painting of walls and ceilings if needed due to device replacement. 7. Contractor shall be responsible for any permits that are required for this project and all work shall meet all local codes. 8. Provide a one-year labor and materials warranty for project. Pricing shall be lump sum bid for all materials and associated with the replacement of the listed devices. Any questions that come up and require additional information will be posted online at www.outagamie.org then Bids / Proposals. Owner's Right to Stop Work If the contractor fails to correct Work which is not in accordance with the requirements of this RFB or fails to carry out Work in accordance with RFB, the County may issue a written order to the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, the right of the County to stop Work shall not give rise to a duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity. Owner's Right to Carry Out Work If the Contractor defaults or fails or neglects to carry out the Work in accordance with the RFB, or fails to perform a provision of the RFB, the County, after 10 days written notice to the Contractor and without prejudice to any other remedy the County may have, may make good such deficiencies and may deduct the reasonable cost thereof. Including County's expenses and compensation for the Architect's services made necessary thereby, from the payment then or thereafter due the Contractor. A PO will be issued by end of day July 14, 2023. Project shall be substantially completed by 3pm December 8, 2023. Failure to achieve substantial completion by December 8th will result in a $50 per calendar day liquidated damages penalty. Any questions that come up and require additional information will be posted online

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents