Similar Projects
Poe Lock Rehibition Ship Arrestors Sault Ste Marie, MI
Renovation
Design
$10,000,000 to $25,000,000 est. value
Sault Sainte Marie, MI

Milham Park Dam Removal
Bidding
Kalamazoo, MI

MacArthur Lock Tainter Valve Machinery Replacement
Post-Bid
$5,000,000 to $10,000,000 est. value
Sault Sainte Marie, MI 49783

Sault Visitor Center Lock Operator Exhibit
Post-Bid
Sault Sainte Marie, MI

Ford Fieldhouse Tunnel Repairs
Results
Grand Rapids, MI

Korpela to Wakefield Stateline Grade Extension Culvert and Bridge Replacement
Results
MI

Gull Lake Dam Improvements
Renovation
Post-Bid
Grand Rapids, MI

Union Street Dam Fish Pass
Results
Traverse City, MI 49684

Flat Rock Dam Boom Installation
Post-Bid
Brighton, MI

2020 Chappel Dam Improvements
Results
Gladwin, MI 48624

Upstream Approach Wall Construction for the Soo Lock Complex, Sault Ste. Marie, MI.
Post-Bid
$100,000,000 to $250,000,000 est. value
Sault Sainte Marie, MI

Eden Dam Modifications and Stabilization Measures
Results
MI

Project Labor Agreement for Construction of New Soo Lock Chamber
Post-Bid
$500,000,000 est. value
Sault Sainte Marie, MI 49783

Perrin Dam Improvements
Results
Marshall, MI

High Temperature Hot Water Replacement to Hill House
Post-Bid
Rochester, MI 48316

Reported 03/28/2020 12:00 AM
Project Title

New Lock at the Soo Chamber Construction

Physical Address View project details and contacts
City, State (County) Sault Sainte Marie, MI 49783   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $500,000,000 to $800,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project consists of the construction of a navigation lock at the Soo Locks complex. The project area is located in Sault Ste. Marie, MI. The lock shall be of nominal 1200-foot length by 110-foot width primarily aligned with the existing Sabin Lock chamber. The major components of the lock construction include construction of cofferdams (sheet pile cells filled with aggregate and concrete) on the upstream and downstream ends of the Sabin and Davis Locks; demolition of the existing North and South Sabin Lock walls along with the existing filling and emptying system; rock excavation to widen and deepen the existing chamber; construction of new lock walls; rehabilitation of downstream approach walls; fabrication and installation of miter gates, culvert valves, and other ancillary items. To accomplish these major features, the scope will include the following items: set-up of on-site concrete batch plant and concrete delivery system; tremie concrete placements; mass concrete placements; structural concrete placements; dewatering of coffered areas; on-site placement of demolition material/excavated rock and soil; fabrication of structural steel components; environmental controls related to construction operations, instrumentation, electrical power and control systems, mechanical systems; four Lock Operations control buildings, and new lock testing/commissioning, and potential remediation of hazardous materials.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents