Similar Projects
Last Updated | 06/15/2022 11:04 AM |
Project Title | GAOA Burnt Cabin Trail Bridge Replacement |
Physical Address | View project details and contacts |
City, State (County) | Milton Freewater, OR (Umatilla County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $250,000 to $500,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Burnt Cabin Trail Bridge Replacement – The contractor shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract to procure and install the Burnt Cabin Bridge on Trail Number 3226. Work includes but is not limited to the minor site preparation and installation of a new, untreated bridge at the designated site and reshaping the approaches to blend with the finished bridge elevation. The old bridge is partially cleared out, however large pieces of the decking remain onsite and will have to be flown out before or after installation of the new trail bridge. Plans are to replace the trail bridges and utilize existing gabion foundations and install two prefabricated steel bridge. |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |