Similar Projects
Water Meter, Water Tower and Lift Station Improvements
Renovation, Infrastructure
Post-Bid
Saint Lawrence, SD

Water Tower No. 2A Improvements
Infrastructure
Results
$2,800,000 to $3,200,000 est. value
Dell Rapids, SD 57022

Water Tower Rehabilitation
Infrastructure
Bidding
Hartford, SD

Saint Lawrence Water and Wastewater Improvements
Infrastructure
Post-Bid
Saint Lawrence, SD

Geddes Consolidation Project Phase 3: 3.0 MG Ground Storage Reservoir
Post-Bid
$1,850,000 est. value
SD 57369

Mount Rushmore National Memorial - Renovate Water Storage Tanks
Renovation
Results
$1,000,000 to $2,000,000 est. value
Keystone, SD

Mount Rushmore National Memorial - Renovate Water Storage Tanks
Results
$1,000,000 to $5,000,000 est. value
Keystone, SD

Volga 750,000 Gallon Water Tower 2020
Results
$2,600,000 to $2,800,000 est. value
Volga, SD

Mitchell West Water Tower Improvements
Alteration
Post-Bid
Mitchell, SD

Water Distribution Improvements - Elevated Water Tower
Infrastructure
Results
$700,000 to $1,000,000 est. value
Lake Preston, SD

250,000 Gallon Water Tower No. 6A
Infrastructure
Results
SD

10,000 Gallon Storage Tank
Term Contract
Post-Bid
SD

Milbank Ground Storage Reservoir Improvements
Infrastructure
Bidding
Milbank, SD

Reported 03/31/2022 11:28 AM
Project Title

50,000 Gallon Water Tower Improvements

Physical Address View project details and contacts
City, State (County) Castlewood, SD   (Hamlin County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Surface preparation and recoating of exterior of 50,000 gallon lattice-legged elevated water storage tank. Tower exterior shall be pressure-washed, spot primed with acrylic mastic, intermediate coat with acrylic mastic, and top coat of acrylic polymer; Surface preparation and recoating of interior of 50,000 gallon lattice-legged elevated water storage tank. Tower interior shall be abrasive blasted to SSPC-SP5, zinc-rich primer, and 100% solids epoxy top-coat; Remove and replace ladder and safety-climb system; Remove and replace overflow screen; Install safety grate over riser.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents