Similar Projects
Washburn Rural Middle School Renovation
Renovation - 96,000 SF
Conception
$7,500,000 est. value
Topeka, KS 66619

New Middle School
New Construction - 146,000 SF
Design
$46,500,000 est. value
Topeka, KS

Washburn Rural High School New CTE, Multipurpose Room & Renovations
New Construction, Renovation - 82,000 SF
Design
$27,500,000 est. value
Topeka, KS 66619

Renovations to Pittsburg Community Middle School
Renovation
Bidding
$15,000,000 est. value
Pittsburg, KS 66762

Royal Valley High School Art, Music and Shop Addition
Renovation, Addition - 13,500 SF
Bidding
$4,000,000 est. value
Hoyt, KS 66440

Coffeyville Field Kindley High School and Roosevelt Middle School, Renovation and Addition
Renovation, Addition
Post-Bid
Coffeyville, KS 67337

Baxter Springs HS Science Classroom Remodel
Renovation
Post-Bid
Baxter Springs, KS 66713

2021 Shawnee Mission North High School and Northwest
Renovation
Results
Overland Park, KS 66202

Construction Management At-Risk Services
New Construction
Results
Inman, KS

Replacement of Santa Fe Trial Middle School
New Construction
Pending Verification
Olathe, KS

Renovation of High School Media Centers
Renovation
Pending Verification
Olathe, KS

Tallgrass New Multipurpose Room
New Construction - 1,200 SF
Design
$500,000 est. value
Topeka, KS

USD 437 Shuler Education Center Bus Barn Addition
Addition - 300 SF
Bidding
$292,000 est. value
Topeka, KS

Louisburg High School Addition and Renovation
Renovation, Addition - 11,420 SF
Post-Bid
Louisburg, KS 66053

Prairie Hills School
Renovation, Addition - 12,000 SF
Results
Sabetha, Wetmore, KS 66534

Last Updated 07/21/2022 03:09 PM
Project Title

Derby High School Administration Addition

Physical Address View project details and contacts
City, State (County) Derby, KS 67037   (Sedgwick County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Construction Manager - 06/30/22
Owner View project details and contacts
Architect View project details and contacts
Description

Derby High School Administrative Addition Derby High School Additions and Renovations Phase 3 The project will consist of remodeling the current principal's office and conference room across from it. Then an office between the two will be removed and a hall will extend south in the new addition. Please address all inquiries to the construction manager. The construction schedule has been released as of 7-8-2022. Addendum #1 & #2 have been issued as of 7-19-2022. Site logistics plan has been issued as of 7-18-2022.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents