Similar Projects
Wernecke Elementary HVAC Upgrades
Alteration
Bidding
McAllen, TX 78504

HQ-HVAC Filter Replacement Services
Term Contract
Bidding
Austin, TX

HVAC Upgrade, Flight Services
Post-Bid
Less than $293,000 est. value
Austin, TX 78744

Dust Collection System
Post-Bid
Austin, TX 78703

HVAC Equipment, Supplies and Installation
Results
Austin, TX 78759

Refrigeration and Air Conditioning and Heating Repairs and Equipment
Results
La Feria, TX 78559

HVAC Preventative Maintenance and Repair
Term Contract
Bidding
Corpus Christi, TX

7.5 Ton HVAC Unit
Post-Bid
Austin, TX 78767

Air and Water Cooled Chiller Annual Inspections and Preventative Maintenance
Term Contract
Results
Corpus Christi, TX 78411

HVAC Maintenance and Repair Austin District
Alteration
Bidding

Campus Heating, Ventilation, and Air Condition (HVAC) Maintenance and Repair Services
Post-Bid
Brownsville, TX

HVAC Maintenance and Mechanical Services
Results
Less than $69,370 est. value
Austin, TX 78701

Shimotsu Elementary HVAC Upgrades
Alteration
Bidding
Mission, TX 78572

Bldg 3 Hvac Replacement
Post-Bid
Corpus Christi, TX 78419

Air Handling Unit Replacements
Results
$2,304,220 est. value
McAllen, TX 78503

Last Updated 02/03/2022 10:08 AM
Project Title

BAS Upgrade Region 3

Physical Address View project details and contacts
City, State (County) Austin, Brownsville, Corpus Christi, Rio Grande City, Weslaco, TX 78416 (Cameron, Hidalgo, Nueces, Starr, Travis Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $82,726
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Contractor will provide all equipment, labor, materials and any needed equipment both hardware and software to upgrade the existing URView Building Automation System (BAS) to Alerton Compass software at the following locations. a. Weslaco Regional b. Brownsville c. Corpus Christi District Office d. Corpus Christi Crime Lab e. Corpus Christi Ancillary Building (formerly Driver’s License office) f. Rio Grande City 2. Contractor will provide and install: a. Seven (7) ACM - Ascent Control Modules - Interface gateways i. Battery back-ups for interface gateways (ACM) ii. Any needed expansion devices such as ACM-OC-2X485 dual port cards b. Device licensing as required for a fully operating system c. The existing URView databases will be migrated to Compass d. The existing SQL history database will be migrated to Compass e. All existing field panel networks connected to Compass f. All existing field panel controllers connected to Compass g. All existing virtual points added to Compass h. All existing user accounts added to Compass i. All existing points renamed as needed and added to Compass j. All existing trend views migrated/added to Compass k. All existing custom reports created for Compass l. All existing points migrated/added to Remote Notification m. All existing user defined views created for Compass n. All existing graphics upgraded for Compass from existing URView graphics o. Hardware as needed. p. Any other miscellaneous materials needed for a fully functional system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents