Similar Projects
Belle Harbor Phase 5 & 6 Townhomes
New Construction
Design
Myrtle Beach, SC 29588

Highway 15 Townhomes
New Construction - 105,000 SF
Design
$10,000,000 CJ est. value
Myrtle Beach, SC

Beach Walk Place - Building 4
New Construction - 5,264 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Myrtle Beach, SC

Proximity Pointe Townhomes
New Construction
Conception
Little River, SC

Myrtle Beach Speedway Redevelopment
New Construction
Conception
Myrtle Beach, SC 29579

Myrtle Beach Christian Church Townhomes
New Construction
Conception
Myrtle Beach, SC 29579

Lennar Carolina Subdivision Phase I - III
New Construction
Conception
Myrtle Beach, SC

The Witch
New Construction
Design
Conway, SC 29526

Exchange Apartments
New Construction
Conception
Myrtle Beach, SC 29572

Holmes Tract
New Construction
Conception
Myrtle Beach, SC

Hunters Ridge
New Construction
Pending Verification
Myrtle Beach, SC 29588

Manufactured Home - Myrtle Beach State Park
New Construction - 1,791 SF
Post-Bid
Myrtle Beach, SC 29575

Grand Dunes North
New Construction
Conception
North Myrtle Beach, SC 29598

Manufactured Home - Myrtle Beach State Park
New Construction - 1,680 SF
Post-Bid
Myrtle Beach, SC 29575

Daminov Development
New Construction - 14,500 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Murrells Inlet, SC

Reported 09/28/2021 12:20 PM
Project Title

Costner Tract

Physical Address View project details and contacts
City, State (County) Little River, SC   (Horry County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method Bids by Invitation.
Project Status Seeking Zoning Variances
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Multi-Family Homes, New Construction, 55 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents