Similar Projects
James Brown Arena
New Construction
Conception
$170,000,000 est. value
Augusta, GA 30901

The Macomber Ball Field Improvements
New Construction
Bidding
Statesboro, GA 30459

Cairo High School - Stadium Restrooms
Renovation
Bidding
Cairo, GA

Rome Middle School Weight Room Addition
Addition - 1,275 SF
Post-Bid
Less than $250,000 est. value
Rome, GA 30161

North Cobb High School Baseball Press Box Remodel
Post-Bid
Kennesaw, GA 30144

Construction of a New Gymnastics Facility
New Construction - 20,500 SF
Results
Less than $3,329,000 est. value
Carrollton, GA

General Contractor Services for South Commons Softball Complex Improvements
Results
Less than $2,990,010 est. value
Columbus, GA 31901

Athletic Field
New Construction
Construction
Augusta, GA

Construction of a New Fieldhouse
Construction
Cartersville, GA

School Facility Maintenance
Post-Bid
Decatur, GA 30032

Cherokee Bluff High School Baseball and Softball Facility
Results
Flowery Branch, GA 30542

Savannah Arena
New Construction - 149,000 SF
Construction
$165,000,000 est. value
Savannah, GA

FY20 Rec Facility Construction
Post-Bid
Douglas, GA

Henderson Stadium Renovation
Renovation, Addition
Results
Macon, GA 31206

Georgia International Convention Center - Gateway Center Arena
Construction
College Park, GA

Reported 11/04/2020 12:00 AM
Project Title

New Construction of Villa Rica High School Football Stadium

Physical Address View project details and contacts
City, State (County) Villa Rica, GA 30180   (Carroll County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility, Stadium
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $6,800,000
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a New Football Stadium at Villa Rica High School which may also include a small classroom addition, and the construction of a New Track and Athletic Field at Temple Middle School.

Details

Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earth Moving, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents