Similar Projects
Last Updated | 04/24/2020 03:07 PM |
Project Title | Tiffany Road Drainage and Pavement Improvements |
Physical Address | View project details and contacts |
City, State (County) | Norwell, MA 02061 (Plymouth County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $900,000 |
Plans Available from | Copy Center - 03/25/20 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work under this contract includes, but is not necessarily limited to furnishing all labor, services, equipment, and materials for the installation of approximately 1,330 linear feet of 18-inch HDPE gravity drain pipe and 250 linear feet of 12-inch HDPE gravity drain pipe; installation of drainage structures including catch basins, manholes, and leaching pits; installation of temporary dewatering systems; installation of erosion control measures; select demolition; roadway-realignment; restoration work. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |