Similar Projects
Contractor - Replace AHU/Return/VAV, 1739, CCSFS
Alteration
Design
$100,000 to $250,000 est. value
Cape Canaveral, FL

Harold Avenue Recreation Center Wind Retrofit
Renovation
Bidding
$400,000 CJ est. value
Port Charlotte, FL 33980

HVAC Unit and HVAC Precision Unit Maintenance and Repair
Renovation
Sub-Bidding
$437,000 CJ est. value
Pompano Beach, FL 33060

Replacement of 20-Ton Roof Top AC Condensing Units at Cocoa City Hall
Renovation
Sub-Bidding
$500,000 CJ est. value
Cocoa, FL 32922

Farm Worker Village HVAC Installation
Post-Bid
Immokalee, FL 34142

FY22-202 - HVAC Installation and Refurbishment
Term Contract, Alteration
Post-Bid
FL

Facilities HVAC Integrated Preventative Maintenance Services
Results
Jacksonville, FL 32212

Replacement of existing HVAC system at Jim Woodruff Powerhouse
Results
$1,000,000 to $5,000,000 est. value
Chattahoochee, FL 32324

Portable Generators for Parks and Recreation
Renovation
Sub-Bidding
$30,000 CJ est. value
Naples, FL 34102

AC Replacement and Relocation
Alteration
Post-Bid
Davie, FL 33330

4120--Equipment: Replace AHU-24
Term Contract
Results
Gainesville, FL

Building 53 Chiller Replacement
Renovation
Sub-Bidding
$800,000 CJ est. value
Jacksonville, FL 32224

HVAC Service
Infrastructure
Post-Bid
Jacksonville, FL 32212

Heating, Ventilation, and Air Conditioning (HVAC) Preventative Maintenance
Term Contract
Results
Jacksonville, FL 32218

HVAC Filters - Supply and Installation Services
Term Contract
Sub-Bidding
Naples, FL 34102

Last Updated 03/23/2023 05:38 AM
Project Title

Gainesville Chiller Plant Maintenance Base Plus Four

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32608   (Alachua County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $66,944 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Mar 22, 2023 Contract Award Number: 36C24823P0881 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: FNBQK6RYKE85 Contractor Awarded Name: ACCORD FEDERAL SERVICES, LLC Contractor Awarded Address: KNOXVILLE, TN 37917-6803 Base and All Options Value (Total Contract Value): $66,944.00 The purpose of this amendment is to provide a revised Statement of Work, provide the sign in sheet from the site visit, and provide answers to the questions received. The date for quotes to be submitted remains at 01/30/2023 3:00pm ET. Attached is a revised Statement of Work. Attached is the sign in sheet from the site visit. Questions submitted: What is the incumbent contract # What licenses and/or certifications are required at the time of quote submission Can the 12/28/22 site visit sign in sheet be made available to offerors What is expected for eddy current testing for the condenser and evaporator sides of chillers What is expected for evaporative tube cleaning of the chillers What is expected for vibration analysis of all equipment What is expected for oil analysis of the chillers Will there be another questions period following the site visit Please confirm whether disinfection of the towers is required during the annual cleaning. What is the frequency of the requested services When does the facility expect the annuals and quarterlies to be completed Are there any known pre-existing conditions that will require immediate attention if we are the successful offeror Should the cost of labor for corrective action discovered during PM be included in the proposal Should the costs of materials and/or equipment for corrective action discovered during PM be included in the proposal Should the cost for labor for emergency responses be included in the proposal Should the cost for labor for corrective actions identified during an emergency response be included in the proposal Should the cost for materials and/or equipment for corrective actions identified during an emergency response be included in the proposal Will there be a threshold to cap the expenditure by the successful offeror for work performed outside of the PM requirements What are the site access procedures Response to questions submitted: There is no longer a Chiller Plant Contract in place. A current Trane Certification needs to be provided at time of quote. The sign-in sheet will be posted with the answers to these questions. Eddy currents are not part of the contract. The tubes in the Evaporator are not cleaned. Only the Condenser. Vibration Analysis is not part of the contract. To be sent off to a lab for analysis. All questions are answered in this amendment. Disinfection is not required in the contract. Chiller Annuals are done once a year. Cooling Towers are cleaned twice a year. Quarterly inspections are done every quarter. We will attempt to follow the schedule at the bottom of this document. None at this time. No, corrective maintenance is not part of this contract. No, corrective maintenance is not part of this contract. No, corrective maintenance is not part of this contract. No, corrective maintenance is not part of this contract. No, corrective maintenance is not part of this contract. No, corrective maintenance is not part of this contract. Check-in at the Plant, ask for the COR. Service Contract Plant Chillers Equipment New Contract 12-20-21 to 12-19-22 12-20-20 to 12-19-21 Comments Chiller 1 Spring A 4/14/2022 4/5/2021 A Chiller 2 Winter A 1/25/2022 1/25/2022 A Chiller 3 Spring A 3/31/2022 1/12/2021 A Chiller 4 Fall A 10/22/2022 10/4/2021 A Chiller 5 Spring A 3/15/2022 4/27/2020 A BAC Tower Winter A 12/20/2021 11/18/2020 A Evapco North Spring Fall 1/11/2022 2/18/2021 A Evapco South Spring Fall 10/22/2022 11/3/2021 A

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents