Similar Projects
Turtle Creek No.3: 42-Inch Water Transmission Main Project
Infrastructure
Bidding
$6,428,071 est. value
San Antonio, TX

BPC East Sewershed Package 4A
Infrastructure
Bidding
$2,516,820 est. value
San Antonio, TX

Replacement 10" Backflow Preventer for UTSA Boulevard
Post-Bid
$80,000 est. value
San Antonio, TX 78249

Toepperwein Road Water Improvements
Post-Bid
Converse, TX 78109

Informal Annual Contract for Water Treatment Services for the Alamodome
Results
San Antonio, TX 78283

End Point Installation (EPI) Services for the ConnectH20 Program
Results
$2,500,000 to $4,000,000 est. value
San Antonio, TX 78200

Dietrich Elevated Storage Tank
Infrastructure
Bidding
$6,244,000 est. value
San Antonio, TX

Redbird Ranch Phase 2 - Water, Sanitary Sewer, Street and Drainage Improvements
New Construction
Post-Bid
San Antonio, TX 78253

Archives Building Backflow Preventer Installation
Results
TX 78207

Lockhill- Selma Pressure Zone (PZ) 1111 30-Inch Water Main Project
Infrastructure
Bidding
$3,216,000 est. value
San Antonio, TX

Back Flow Inspection, Maintenance, Repair and Installation
Term Contract
Post-Bid
San Antonio, TX 78204

W-6 Upper Segment Highway 90 to SW Military Drive Sewer Main Project
Results
Less than $162,905,600 est. value
San Antonio, TX 78212

Butterfly Valve
Infrastructure
Bidding
San Antonio, TX

Water Chiller - Solid State Starter Replacement
Post-Bid
San Antonio, TX 78236

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 08/02/2021 07:47 AM
Project Title

Highland Hill Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,211,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids for the replacement and new installation of approximately 16,000 linear feet of existing 6-inch, 8-inch and 16-inch water mains with new HDPE and DI water pipe by open-cut method in the Highland Hills and South Side Lions Park neighborhood.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents