Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 CJ est. value
Forest Grove, OR 97116

Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 CJ est. value
Forest Grove, OR 97116

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

RFP - Tualatin River Greenway Trail Extension Project
Infrastructure
Bidding
$50,000 CJ est. value
Tualatin, OR 97062

RFP - Water Utility Rate Study
Term Contract
Bidding
North Plains, OR 97133

SW Tualatin-Sherwood Road SW Langer Farms Pkwy to SW Teton Ave and Plm_4.2 - 66" Water Transmission Pipeline
Infrastructure
Post-Bid
$69,000,000 CJ est. value
Tualatin, OR 97062

SW Tualatin-Sherwood Road SW Langer Farms Pkwy to SW Teton Ave and Plm_4.2 - 66" Water Transmission Pipeline
Infrastructure
Post-Bid
$69,000,000 CJ est. value
Tualatin, OR 97062

2022 Re-Pipe
Infrastructure
Results
$800,000 est. value
Beaverton, OR 97007

SW Division Street Culvert Replacement Project (Rebid)
Infrastructure
Results
$1,349,930 CJ est. value
Aloha, OR 97007

Pacific Highway Street Lights - 95065 - City Of Tigard
Infrastructure
Construction
$718,423 CJ est. value
Tigard, OR 97223

Century Boulevard/TV Highway Intersection #100294 - Washington County
Infrastructure
Construction
$3,691,800 CJ est. value
Hillsboro, OR 97123

Highway 99W Pedestrian Crossing Project - City of Sherwood
New Construction, Infrastructure
Pending Verification
$11,500,000 CJ est. value
Sherwood, OR 97140

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Park Place Bridgeport Mixed Use
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Last Updated 09/21/2023 03:32 AM
Project Title

SW Barnes Road and SW Viewmont Drive Waterline Improvements

Physical Address View project details and contacts
City, State (County) West Haven-Sylvan, OR 97225   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work for the Project consists of furnishing required labor, equipment, and materials for construction of the following: 1. Approximately 1,000 linear feet (lf) of 12-inch, 700 lf of 8-inch, and 120 lf of 6-inch ductile iron restrained-joint water piping with ductile iron fittings and polyethylene encasement. 2. Install via horizontal directional drilling approximately 200 lf of owner-furnished 14-inch HDPE and reducer connections. 3. One fire hydrant including ductile iron fire hydrant leads with polyethylene encasement, abandonment of existing water mains, five water service replacements, testing and special inspection, associated surface & fence restoration, clean-up, traffic control, erosion control, and incidental related work as described in the Contract Documents. 4. Engineers Estimate is $650,000 – $800,000. Bids must be submitted on the prescribed forms and must be accompanied by a certified check or bid bond executed in favor of the Tualatin Valley Water District in an amount not less than ten (10) percent of the amount bid. The successful bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract as prescribed in the Contract Documents. The Owner reserves the right to reject all bids not in compliance with all prescribed public contracting procedures and requirements, including bidder responsibility under ORS 279C.375(3)(b), and may reject for good cause all bids upon the Owner’s finding that it is in the Owner’s or the public’s best interest to do so. The Owner reserves the right to waive informalities and to award a Contract to the qualified lowest responsive and responsible bidder. The successful Bidder must achieve Substantial Completion September 27, 2024 and Final Completion by October 31, 2024. Notice to Proceed is anticipated to be issued April 1, 2024.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents