Project Title | SW Barnes Road and SW Viewmont Drive Waterline Improvements |
Physical Address | View project details and contacts |
City, State (County) | West Haven-Sylvan, OR 97225 (Washington County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2024 |
Bids Due | View project details and contacts |
Estimated Value | $800,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed work for the Project consists of furnishing required labor, equipment, and materials for construction of the following: 1. Approximately 1,000 linear feet (lf) of 12-inch, 700 lf of 8-inch, and 120 lf of 6-inch ductile iron restrained-joint water piping with ductile iron fittings and polyethylene encasement. 2. Install via horizontal directional drilling approximately 200 lf of owner-furnished 14-inch HDPE and reducer connections. 3. One fire hydrant including ductile iron fire hydrant leads with polyethylene encasement, abandonment of existing water mains, five water service replacements, testing and special inspection, associated surface & fence restoration, clean-up, traffic control, erosion control, and incidental related work as described in the Contract Documents. 4. Engineers Estimate is $650,000 – $800,000. Bids must be submitted on the prescribed forms and must be accompanied by a certified check or bid bond executed in favor of the Tualatin Valley Water District in an amount not less than ten (10) percent of the amount bid. The successful bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract as prescribed in the Contract Documents. The Owner reserves the right to reject all bids not in compliance with all prescribed public contracting procedures and requirements, including bidder responsibility under ORS 279C.375(3)(b), and may reject for good cause all bids upon the Owner’s finding that it is in the Owner’s or the public’s best interest to do so. The Owner reserves the right to waive informalities and to award a Contract to the qualified lowest responsive and responsible bidder. The successful Bidder must achieve Substantial Completion September 27, 2024 and Final Completion by October 31, 2024. Notice to Proceed is anticipated to be issued April 1, 2024. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |