Similar Projects
Great Miami River Recreation Bike Trail - State of Ohio
Infrastructure
Conception
$500,000 CJ est. value
Moraine, OH 45439

Great Miami River Recreation Bike Trail - State of Ohio
Infrastructure
Conception
$500,000 CJ est. value
Moraine, OH 45439

Park Center Drive Senior Residential Development
New Construction, Infrastructure - 71,500 SF
Design
$64,800,000 CJ est. value
Dayton, OH 45414

Park Center Drive Senior Residential Development
New Construction, Infrastructure - 71,500 SF
Design
$64,800,000 CJ est. value
Dayton, OH 45414

Tom Cloud Path Resurfacing
Infrastructure
Post-Bid
$189,787 CJ est. value
Huber Heights, OH 45424

Tom Cloud Path Resurfacing
Infrastructure
Post-Bid
$189,787 CJ est. value
Huber Heights, OH 45424

Bill Yeck Park Trail Extension
Addition
Results
$135,569 est. value
Dayton, OH 45459

Home Avenue Bikeway
Infrastructure
Results
$350,000 est. value
Dayton, OH 45426

Valvoline Instant Oil Exchange
Renovation - 3,776 SF
Construction
$1,200,000 est. value
Miamisburg, OH 45342

Homefull Campus
New Construction, Infrastructure - 12,000 SF
Construction
$14,000,000 CJ est. value
Dayton, OH 45417

Trinity Community at Beavercreek - United Church Homes
Addition, Demolition, Infrastructure - 168,000 SF
Pending Verification
$8,000,000 CJ est. value
Beavercreek, OH 45440

The Foodbank Expansion
Addition, Demolition, Infrastructure - 6,000 SF
Pending Verification
$5,188,349 CJ est. value
Dayton, OH 45417

Social Row Road Improvements - SS-9 - City of Centerville
Infrastructure
Conception
$795,000 CJ est. value
Centerville, OH 45459

Bridge Preservation
New Construction, Demolition, Infrastructure
Design
$343,000 est. value
Riverside, OH 45431

2022 Curb Rehabilitation Program Phase II
Infrastructure
Post-Bid
$803,843 est. value
Dayton, OH

Last Updated 02/20/2024 01:06 PM
Project Title

Buc-ee's / Huber Heights

Physical Address View project details and contacts
City, State (County) Huber Heights, OH 45424   (Montgomery County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected March 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of Janaury 30 2024The project will be starting in February 2024 the gc has not been announced yet.

Details

74,000 SF. Parking Spaces, 700 Parking Spaces.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents