Similar Projects
2022 Street and Utility Improvement Project
Infrastructure
Bidding
$2,030,000 est. value
Saint Anthony, MN

TCHC Utility Improvements
New Construction, Infrastructure
Bidding
Wadena, MN

2021 Cleaning, Repairing, Painting 1,500,000 Gallon Elevated Water Storage Tank, Tower Number One
Post-Bid
Golden Valley, MN

Ductile Iron Pipe
Term Contract
Post-Bid
Minneapolis, MN

Meter Station M228A, Interceptor 7015C, and L35 Repair
Renovation, Addition
Results
Brooklyn Park, Maple Grove, MN 55101

Water Storage Tank Rehabilitation
Results
Less than $1,120,820 est. value
Minnetonka, MN

Halbur Road Reconstruction
Infrastructure
Bidding
$1,177,466 est. value
Marshall, MN 56258

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

2021 Street Reconstruction Project Grading, Base, Bituminous Surfacing, Concrete Curb and Gutter, Storm Sewer and Water Main
Results
Less than $4,600,000 est. value
Plymouth, MN

New 750,000 Gallon Water Tower and Water Tower No. 1 Reconditioning
Infrastructure, Alteration
Bidding
Robbinsdale, MN

Regional Drinking Water Project Contract C - Elevated Water Tower
New Construction
Post-Bid
Cloquet, MN 55720

Old Village Phase 5 And 6 Street, Drainage and Utility Improvements
Results
MN

2022 Street Reconstruction
Term Contract, Infrastructure
Bidding
Lakeville, MN

West Bridge Street Reconstruction
Post-Bid
$3,400,000 est. value
Owatonna, MN

Phase 4 Street and Utility
Results
Minneapolis, MN

Last Updated 01/28/2022 02:54 AM
Project Title

Water Tower and Utility Improvements

Physical Address View project details and contacts
City, State (County) Shafer, MN   (Chisago County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: Bid #1 Utility Improvements - Installation of 12-inch watermain, additional connection to water tower standpipe, miscellaneous utility adjustments, and restoration. Bid #2 Tower Reconditioning – Complete coating removal and replacement of all exterior and wet interior surfaces, and spot repair for an existing 75,000 gallon elevated steel hydrocone water tower, tower electrical replacements and restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents