Similar Projects
Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

FY 21/22 Chip Sealing of Area 3 and Salt Mine Road
Infrastructure
Bidding
Camp Verde, AZ 86322

Senator Highway Slope Improvements
Infrastructure
Bidding
$173,640 est. value
Prescott, AZ

AZ FTFS 104(1) Mingus Mountain
Post-Bid
$400,000 to $1,000,000 est. value
AZ 86326

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

System Enhancement-Other Enhancements
Results

Annual Asphalt Paving Program FY20/21
Term Contract
Results
Less than $1,000,000 est. value
Prescott Valley, AZ

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Bidding
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Design-Build Services for Verde Connect Road, SR 260 to Cornville Road
Post-Bid
Prescott, AZ 86305

Long Look Pavement Replacement Project
Results
$200,000 to $250,000 est. value
Prescott Valley, AZ

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

Outer Loop Road Pavement Rehabilitation
Results
Less than $2,036,100 est. value
Prescott, AZ 96305

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Chip Seal Program FY 2020/2021
Term Contract
Results
$600,000 to $700,000 est. value
Prescott Valley, AZ 86314

Roadway and Parking Lot Crack Seal with Seal Coat Applications
Post-Bid
Prescott, AZ

Last Updated 09/10/2021 06:16 AM
Project Title

FY22 Pavement Rehabilitation Project - Phase 1

Physical Address View project details and contacts
City, State (County) Prescott, AZ 86301   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of pulverizing and blending in place the existing asphalt pavement surface, base preparation of recycled base material and placement of new asphalt concrete atop. The roadways included in the project are: Prescott Heights Drive, Campbell Avenue, Flora Street and Black Drive. The work includes pavement repairs, the adjustment of utility covers to finish grade, some minor drainage repairs and the restoration of disturbed traffic striping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents