Similar Projects
Waterset By Newland
New Construction
Conception
Apollo Beach, FL 33572

The Motor Enclave
New Construction - 16,000 SF
Conception
$100,000,000 est. value
Tampa, FL 33610

Nolte Road Commercial Park
New Construction
Design
Saint Cloud, FL 34772

Oviedo on the Park - Lot 4 - Sitework
New Construction
Design
Oviedo, FL 32765

Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

Cumberland Farms #9747 Off-Site - Utility Project
New Construction, Renovation
Post-Bid
Micco, FL

Unsolicited Proposal for the Development, Operation and Maintenance of a Soccer Complex and Other Facilities
Results
Miramar, FL

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Titusville Point - Site Development
New Construction
Construction
Titusville, FL 32780

Fallschase at Pathstone
New Construction
Pending Verification
Pensacola, FL

Jacksonville Zoo Docks
New Construction
Pending Verification
$1,000,000 est. value
Jacksonville, FL 32218

Callahan Country RV & Water Park
Renovation
Conception
Callahan, FL 32011

Highpointe PUD
New Construction - 588,000 SF
Design
Stuart, FL 34997

Sereno Subdivision, Phases 7A and 7B and Phases 8A and 8B
Post-Bid
Wimauma, FL

Last Updated 12/20/2021 08:36 AM
Project Title

Northwest Well No. 7 Wellhead and Site Improvements

Physical Address View project details and contacts
City, State (County) FL   (Saint Johns County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Pumps and Wells, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of the Northwest Well No. 7 Wellhead and Site Improvements project requires the Contractor to furnish all labor, materials, equipment, and incidentals required to install the wellhead piping, the final well casing flange, an owner furnished vertical turbine well pump with a 50-HP motor, Variable Frequency Drive (VFD), an owner furnished 50 kW standby diesel generator sets and automatic transfer switch, associated appurtenances, raw water main, concrete well pad, instruments, controls, electrical equipment, all necessary soil and erosion control devices, construct the well site access road, pressure test and disinfect the well, and demolish electrical, instrumentation, and control work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents