Last Updated | 03/24/2023 04:19 PM |
Project Title | Curb and Gutter Project 2023 |
Physical Address | View project details and contacts |
City, State (County) | Pierre, SD 57501 (Hughes County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $455,199 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 2023 Which Includes but is Not Limited to Bid Schedule "a": 903 Lf of R&r C&g; 199 Lf of R&r 6" P-gutter; 1260 Sf of R&r of 4" Sw for Ada Curb Ramps; 200 Sf of R&r of 6" Fillet; Remove Tree Roots Per Tree 9 Each; Remove and Reset 3 Each Frame and Grates; Install 9 Each (2'x4') Truncated Dome Warning Panels; 208 Lf of Saw Cutting; 18 Sf of R&r of 4" Concrete (24" Behind C&g); 404 Sf of R&r of 6" Concrete (24" Behind C&g). Bid Schedule "B": 1404 Lf of R&r C&g; 253 Lf of R&r 6" P-gutter; 150 Sf of R&r of 6" Concrete; 2952 Sf of R&r of 4" Sidewalk for Ada Curb Ramps; 550 Sf of R&r of 6" Fillet; Remove Tree Roots Per Tree 22 Each; Remove and Reset Mailbox 5 Each; Remove and Reset 9 Each Frame and Grates; Install 23 Each (2'x4') Truncated Dome Warning Panels; 327 Lf of Saw Cutting; 246 Sf of R&r of 4" Concrete (24" Behind C&g); 408 Sf of R&r of 6" Concrete (24" Behind C&g). Bid Schedule "C": 2688 Lf of R&r C&g; 671 Lf of R&r 6" P-gutter; 381 Sf of R&r of 6" Concrete; 1144 Sf of R&r of 4" Sidewalk for Ada Curb Ramps; 1042 Sf of R&r 4" Sidewalk(Flat Work); 285 Sf of R&r of 6" Fillet; 152 Sf of Valley Gutter; Remove Tree Roots Per Tree 11 Each; Remove and Reset Mailbox 7 Each; Remove and Reset 4 Each Frame and Grates; Install 12 Each (2'x4') Truncated Dome Warning Panels; 1 Each Roof Drain; 800 Lf of Saw Cutting; 453 Sf of R&r of 4" Concrete (24" Behind C&g); 1095 Sf of R&r of 6" Concrete (24" Behind C&g). Extent of the Work is to Be on City Streets, Avenues, and Alleys in the City of Pierre. The Board of City Commissioners Reserves the Right to Reject Any or All Bids. |
||||
Details |
|
||||