Similar Projects
Indiana Avenue - Streetscape Improvements - Phase Two of Two
Infrastructure
Conception
$750,000 CJ est. value
Sheboygan, WI 53081

Indiana Avenue - Streetscape Improvements - Phase Two of Two
Infrastructure
Conception
$750,000 CJ est. value
Sheboygan, WI 53081

Biggby Coffee / Sheboygan
New Construction, Infrastructure
Design
$500,000 CJ est. value
Sheboygan, WI 53083

Johnston's Bakery Frozen Dough Facility Expansion
Addition, Demolition, Infrastructure - 10,450 SF
Design
$1,000,000 CJ est. value
Sheboygan, WI 53081

Road and Parking Lot Improvements - Kohler Andrae State Park
Infrastructure
Bidding
$500,000 CJ est. value
Sheboygan, WI 53081

Road and Parking Lot Improvements - Kohler Andrae State Park
Infrastructure
Bidding
$500,000 CJ est. value
Sheboygan, WI 53081

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

North Town Site Development
New Construction, Infrastructure
Post-Bid
$470,000 est. value
Sheboygan, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

CTH V Phase 2
Infrastructure
Results
Waldo, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Tidy Store Gas Station Addition
Addition, Infrastructure - 1,500 SF
Pending Verification
$400,000 CJ est. value
Sheboygan, WI 53081

The Kohler Company Golf Course
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Sheboygan, WI 53081

Streets Division - Lincoln Avenue (North Point Drive to North Sixth Street) - City of Sheboygan
Infrastructure
Conception
$1,000,000 CJ est. value
Sheboygan, WI 53081

Last Updated 02/20/2023 06:12 PM
Project Title

Streets Division - South 11th Street (Indiana Avenue to Union Avenue) - City of Sheboygan

Physical Address View project details and contacts
City, State (County) Sheboygan, WI 53081   (Sheboygan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Strategic Plan Focus Area(s): Quality of Life, Infrastructure and Public Facilities, Economic Development, Neighborhood Revitalization. Paser Rating - 3.5. The section of roadway was constructed with concrete in 1923. The roadway has received asphalt overlays. This project would remove existing asphalt and replace with three inches of new asphalt. The related storm sewer and curb and gutter will be evaluated for upgrades. This project will include reconstruction of sidewalk ramps to meet ADA requirements. This project will utilize ARPA funds. As of February 20, 2023, this project is included in the City of Sheboygan's 2023-2027 Capital Improvement Plan (CIP). Design firm information and a firm timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents