Similar Projects
Artcenter Manatee
New Construction
Conception
Bradenton, FL 34205

Oasis At Lakewood Ranch
New Construction - 50,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bradenton, FL 34202

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

Heritage Harbour Masterplan
New Construction - 958,837 SF
Design
Bradenton, FL 34201

Town Center At University Groves - Independent Living Facility
New Construction - 250,337 SF
Post-Bid
$25,000,000 to $30,000,000 est. value
Sarasota, FL 34243

The Collection
New Construction - 56,059 SF
Post-Bid
$12,495,600 est. value
Sarasota, FL 34236

Renovation of Recreation Hall
Renovation
Results
Bayshore Gardens, FL 34207

Risdon on 5th
New Construction - 46,000 SF
Construction
$5,000,000 est. value
Sarasota, FL 34236

Oasis at Sarasota
New Construction
Construction
$20,000,000 to $25,000,000 est. value
University Park, FL 34201

Longboat Key Center for Arts Culture and Education
New Construction
Conception
Longboat Key, FL

Vorbeck Moccasin Wallow Apartments - Phase II
New Construction - 6,190 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Palmetto, FL 34221

Shoreview Apartments - Phase Two
New Construction - 88,186 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Bradenton, FL 34208

Ranch Lake - Phase 2
New Construction - 291,244 SF
Construction
$33,325,000 est. value
West Bradenton, FL 34205

The Addison Phase 2
New Construction
Conception
Bradenton, FL 34208

Carr Landing
New Construction
Design
Bradenton, FL 34203

Reported 01/25/2019 10:17 AM
Project Title

Sandpiper Place

Physical Address View project details and contacts
City, State (County) Bradenton, FL 34203   (Manatee County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club
Contracting Method Bids by Invitation.
Project Status Seeking Funding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 4 Apartments/Condominiums, 3 Stories Above Grade, New Construction 92 Unit(s), Clubhouse/Social Club, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents