Similar Projects
Last Updated 08/23/2021 03:57 PM
Project Title

2021 Paving

Physical Address View project details and contacts
City, State (County) Geneva, IL 60134   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes paving at multiple sites. Project A: Peck Farm Parking Lot Section #1-Approximately 26,795 SF, Section #2-Approximately 11,116 SF, Section #3-Approximately 13,244 SF; Project B: Old Mill Trail Sections-Approximately 587 SF; Project C: Typical Asphalt Parking Lot Detail EACH SECTION OF PARKING LOT AT PECK FARM SHOULD BE BID SEPARATELY. To clarify the restoration, for the edges, Contractor will be responsible for bringing in topsoil and prepping the areas along the newly paved sections. Owner will seed and blanket as needed. In the event Contractor damages additional turf away from the edges, then Contractor would be responsible for turf restoration at their expense which would include topsoil, seed and possibly blanket (depending on the size of the area(s) affected).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents