Similar Projects
Miller Farms (Lateral B) Drainage Improvements - City of Germantown
Infrastructure
Conception
Less than $7,600,000 est. value
Memphis, TN 38138

Miller Farms (Lateral B) Drainage Improvements - City of Germantown
Infrastructure
Conception
Less than $7,600,000 est. value
Memphis, TN 38138

Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

March 2021 Storm Emergency Watershed Protection
Infrastructure
Bidding
$830,000 est. value
Tazewell, TN

Carson Road/McConkey Street Water Lines and Miscellaneous Fire Hydrant Replacements
Infrastructure
Bidding
$415,000 est. value
Madisonville, TN 37354

Fire Hydrants, Valves, and Parts Replacement
Term Contract
Post-Bid
TN

Freewill Road/Hensley Road Water Main Improvements
Post-Bid
Cleveland, TN 37312

Concrete Pathway Installation, Landscaping, Storm Water Structure Modifications, Irrigation System, L.E.D. Pedestrian Lighting, Installation of ADA Compliant Crossing Ramps, Railroad Safety Improvements
Results
Chattanooga, TN

2018 CDBG Water System Improvements - 5th Street and City Tank Area
Results
$400,000 to $450,000 est. value
Jellico, TN

Small Diameter Waterline Replacement - City of Johnson City
Infrastructure
Conception
$1,000,000 est. value
Johnson City, TN

Toe String Bridge Water Main Replacement Project
Renovation, Infrastructure
Bidding
$270,000 est. value
Spring City, TN

Town Center Water Main
Renovation
Post-Bid
White House, TN 37188

Galvanized Water Line Replacements
Results
Johnson City, TN

Lower Boones Creek Interceptor I-26 to B Station Replacement - City of Johnson City
Alteration
Conception
$5,200,000 est. value
Johnson City, TN 37604

Reported 07/05/2022 10:45 AM
Project Title

Buffalo Valley Streambank Mitigation - City of Johnson City

Physical Address View project details and contacts
City, State (County) Johnson City, TN   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Johnson City, Tennessee. Conceptual plans call for site work for a water / sewer project. Storm Water Buffalo Valley Streambank Mitigation A detailed scope has not yet been determined This project is included in the city's 2023 Capital Improvement Plan (CIP). As of July 01, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents