Similar Projects
CHRL Pump Station 1a, 2, & 3
New Construction
Conception
$750,000 est. value
WA

Lafayette Townhouse Development
New Construction
Design
Seattle, WA 98144

Fences And Gates Upgrade Phase II
Renovation, Infrastructure
Design
$175,000 est. value
WA

Pump Station 26 and Citywide Storm Water Safety SCADA Improvements
Renovation, Infrastructure
Bidding
$3,000,000 est. value
Shoreline, WA

Yakima County Roads & Facilities
Term Contract
Post-Bid

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Richmond Beach Pump Station Low Voltage Switchboard and MCC Replacement
Alteration
Results
$2,558,000 est. value
Seattle, WA 98177

Spring District Block 6 Office Building Parking Garage Retail
New Construction, Build-Out - 2,160 SF
Construction
$10,000,000 CJ est. value
Bellevue, WA 98005

Latona Station Apartments
New Construction - 194,500 SF
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98105

BelleVista Place Mixed Use Development
New Construction
Pending Verification
Bellevue, WA

North Mercer Island and Enatai Interceptor Upgrade - Pump Station Improvements
Alteration
Post-Bid
Mercer Island, WA 98040

Airlift Pump Station 38 Replacement
Renovation
Results
$1,300,000 est. value
Seattle, WA 98116

Irrigation Renovation Repair at Mt Baker Station
Alteration
Post-Bid
Seattle, WA 98144

FAA Airport Traffic Control Tower Design Competition
New Construction
Post-Bid

Last Updated 02/22/2022 12:36 PM
Project Title

Lift Station and Force Main Rehabilitation Phase 2

Physical Address View project details and contacts
City, State (County) Renton, WA   (King County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents