Similar Projects
Madison - Packwaukee, IH 90/94/78 to the Wisconsin River
Infrastructure
Bidding
WI

2022 Alley Improvement
Infrastructure
Bidding
Portage, WI

Columbia County Road Improvements
Renovation
Post-Bid
Columbus, WI

Wendt Road in Town of Columbus and Berkvam Road in Town of Otsego
Renovation
Post-Bid
Columbus, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

2022 Chip Seal
Infrastructure
Bidding
Portage, WI

2021 Chip Seal
Post-Bid
$82,938 est. value
Portage, WI

C. Portage, Wisconsin and Dewitt Sts, Ontario Street to E. Pleasant Street
Results
Portage, WI 53901

2022 Crack Filling
Infrastructure
Bidding
Portage, WI

2021 Pavement Rehabilitation
Post-Bid
$186,388 est. value
Portage, WI

2021 Gay Street Improvements
Results
Lodi, WI 53555

Crack Fill, Emulsified Sealer/Binder and Pavement Marking
Post-Bid
Wisconsin Dells, WI 53965

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Resurfacing Barry Road
Post-Bid
Pardeeville, WI

Last Updated 02/14/2022 02:55 AM
Project Title

C. Columbus, Farnham Street, 0.32 Mi. S. of Avalon Road to Park Avenue

Physical Address View project details and contacts
City, State (County) WI   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation, Base, HMA Pavement, Curb and Gutter, Sidewalk, Signs, Pavement Marking, Street Lighting, Storm Sewer, Sanitary Sewer, and Culvert Endwall Construction. Excavation Common, 19,240 CY; Backfill Structure, 360 Ton; Base Aggregate Dense, 9,865 Ton; Select Crushed Material, 21,949 Ton; Concrete Pavement, 35 SY; Concrete Masonry Culverts, 64 CY; Bar Steel Reinforcement, 6,240 Lbs; Marking Epoxy, 10,592 LF; Construction Staking, 22,235 LF; Construction Staking, 113 Each; Construction Staking, 6 LS; Conduit, 4,628 LF; Culvert Pipe, 100 LF 12”; Storm Sewer Pipe, 27 LF 12“, 866 LF 15“, 193 LF 18“, 3,044 LF 24“, 114 LF 30“; Storm Sewer / Culvert Pipe Horizontal Elliptical or Pipe Arch, 20 LF 19” X 30”, 143 LF 24” X 38”, 813 LF 29” X 45”; Concrete Curb and Gutter, 8,032 LF; Concrete Sidewalk, 31,387 SF; HMA Pavement, 5,050 Ton; Tack Coat, 1,049 Gals; Signs, 264 SF; Powder Coating Light Poles, 48 Each; 8-Inch Water Main with Granular Backfill, 1,414 LF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents