Similar Projects
Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Sanitary Sewer Rehabilitation - Phase I
Results
$400,000 to $450,000 est. value
Mascoutah, IL

Sanitary Sewer Rehabilitation Phase I
Results
Mascoutah, IL

2021 Sewer Lining Program
Results
O'Fallon, IL

Dispenser Sumps & STP Tank Sump
Results
Cahokia, IL

Sanitary Sewer Repair
Infrastructure
Results
Cahokia, IL 62206

CDBG PY 20 - Swansea Sanitary Sewer Lining - Brackett Street
Infrastructure
Post-Bid
Swansea, IL

Sewer Line Repair at Winstanley
Infrastructure
Results
East Saint Louis, IL 62201

Sanitary Sewer Trunk Line Rehabilitation
Infrastructure
Results
$1,174,000 est. value
Fairmont City, IL 62201

Sanitary Sewer Lining At Falling Springs Road (C.I.P.P. Sewer Remediation CDBG PY 2021 Phase VII)
Infrastructure
Post-Bid
Sauget, IL 62201

Capitol Oaks Sanitary Sewer Rehabilitation Phase 4
Infrastructure
Post-Bid
$300,000 est. value
O'Fallon, IL

Franklin,Smith South Street Sewer Replacement
Infrastructure
Post-Bid
$250,000 est. value
Smithton, IL 62285

Sewer Lining
Infrastructure
Bidding
$200,000 est. value
Millstadt, IL

Sewer Plant Operations
Infrastructure, Alteration
Post-Bid
$1,000,000 est. value
IL

Sanitary Sewer Rehabilitation PY21 CIPP Lining - Various Locations
Infrastructure
Bidding
$200,000 est. value
Cahokia, IL

Reported 05/11/2022 12:00 AM
Project Title

Sanitary Manhole and Wet Well Rehabilitation

Physical Address View project details and contacts
City, State (County) Dupo, IL   (Saint Clair County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done under this contract consists of the rehabilitation of 9 Sanitary Manholes and 3Wet Well Lift Stations. The rehabilitation will include complete manhole lining utilizing Epoxy Lining. Work to be done in preparation of the epoxy lining on each manhole varies, and includes, but is not limited to: cleaning/prep, step removal, chemical grouting and sealing, cementitious repair and provisions for bypass pumping. For the rehabilitation work in this project, no excavation by the Contractor nor other surface disturbance is anticipated.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents