Similar Projects
Pleasant Street Subdivision
New Construction
Conception
Brockton, MA 02301

Residences at Atlantic Country Club and Inclusionary Housing
New Construction, Infrastructure
Conception
$21,877,600 CJ est. value
Plymouth, MA 02360

Keenes Mill Village
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Duxbury, MA 02332

Sandwich Road/Duplex - Megryco
New Construction, Infrastructure
Design
Plymouth, MA 02360

Mental Health Outpatient Renovation Building 5
Term Contract, Renovation, Infrastructure
Bidding
$20,000,000 CJ est. value
Brockton, MA 02301

RFQ Contractor - Construction of a New Hingham Elementary School
New Construction, Infrastructure - 126,385 SF
Bidding
$257,000 CJ est. value
Hingham, MA 02043

Plymouth Fire Station No 5 - Additions and Renovations - Sub
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$8,000,000 CJ est. value
Plymouth, MA 02360

Construction of the Hingham Public Safety Facility - SUB Bid
New Construction, Infrastructure
Sub-Bidding
$38,000,000 CJ est. value
Hingham, MA 02043

Underground Condensate Piping Replacement - General Bid
Renovation, Infrastructure
Post-Bid
$2,071,466 CJ est. value
Bridgewater, MA 02324

Underground Condensate Piping Replacement - General Bid
Renovation, Infrastructure
Post-Bid
$2,071,466 CJ est. value
Bridgewater, MA 02324

Campsite Restorations
Infrastructure
Results
$2,000,000 est. value
Barnstable, Boston, Essex, Norfolk, Plymouth, Worcester, MA

Wareham Fire District Headquarters - Site Improvements
Infrastructure
Results
Wareham, MA 02571

Middleborough Park Department - Basketball Court Re-Paving
Infrastructure
Construction
$150,000 CJ est. value
Middleborough, MA 02346

Main Street Battery Storage Warehouse
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Carver, MA 02330

Cushing Street Residential Subdivision
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Hingham, MA 02043

Last Updated 03/21/2023 03:05 AM
Project Title

Route 104 Pump Station - Wetwell Lining Project

Physical Address View project details and contacts
City, State (County) Bridgewater, MA 02324   (Plymouth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $115,847 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Route 104 Pump Station - Wetwell Lining Project. Work consists of epoxy lining of the existing Route 104 Pump Station wetwell including bypass pumping, wetwell cleaning, removal and disposal of debris, maintaining all sewer flows during construction, interior and exterior sealing, surface preparation, protection of wetwell internal equipment and appurtenances, furnishing and mixing materials, epoxy lining, testing, and all labor, equipment and materials required for or incidental to the work. Question Deadline 03/08/2023 All questions about the meaning or intent of the Bidding Documents shall be submitted electronically in writing via emailed word documents to: DPC Engineering, LLC Email: bidding@dpcengineering.com

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents