Last Updated 02/11/2022 07:59 AM
Project Title

2022 Pine St & North St. Reconstruction & Water Main

Physical Address View project details and contacts
City, State (County) Midland, MI   (Midland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CONTRACT NO. 03 is for the street reconstruction of Pine St. from Rodd St. to George St. and on North St. from George St. to Jefferson Ave. as well as for water main installation on Pine St. from Cronkright St. to George St. Some of the quantities listed in the Itemized Bid are as follows: 320 Lft 8” PVC C909 Water Main 4,900 Lft Remove & Replace Concrete Curb & Gutter 7,300 Syd Crushing & Shaping 1,720 Ton Bituminous Pavement

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents