Similar Projects
FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Ground Based Strategic Deterrent - Integrated Training Center, Fe Warren AFB, WY
New Construction, Term Contract - 76,511 SF
Post-Bid
$7,750,000 est. value
Fe Warren Afb, WY

Professional Service
New Construction, Infrastructure
Post-Bid
$40,000 est. value
Cheyenne, WY

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Public Works Energy A-E Services - Worldwide
Renovation
Post-Bid
$40,000 to $3,000,000 est. value

Reported 01/25/2022 12:00 AM
Project Title

EHRM Infrastructure Upgrades

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82001   (Laramie County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $10,000,000 to $20,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Architect-Engineering (A-E) services for the development of complete construction documents, which include working drawings, specifications, reports and construction period services for Project # 442-21-700 EHRM Infrastructure Upgrades Cheyenne, WY project located at the VA Cheyenne VA Medical Center, Cheyenne, Wyoming. A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facility infrastructure to support the new Electronic Health Record Modernization (EHRM) system in accordance with VA OEHRM Site Infrastructure Requirements (provided by VHA). The scope of this project includes but not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), relocation/buildout of existing Data Center (new construction, patch, finish), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) and renovation of bathroom impact, in buildings as necessary, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, install diversified path to datacenter for WAN, hazardous material abatement. Project Building locations include: Buildings 1, 4, 5, 6, 7, 8, 11, 12, 13, 31 and site. A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 2 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance and participation during the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor’s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. All Part Two Services are optional line items and will not be exercised at the time of award.

Details

Architectural, New Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents