Similar Projects
2022 Bond - Proposition A - Seguin Independent School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Conception
$135,000,000 CJ est. value
Seguin, TX 78155

Cordova Rd
Infrastructure
Conception
$22,256,128 CJ est. value
Seguin, TX 78155

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Loop 1604 and I-10 Interchange - Texas Department of Transportation
Infrastructure
Design
$1,360,000,000 CJ est. value
Schertz, TX 78154

Widen Road - Add Lanes - IH 10
Infrastructure
Bidding
$218,880,117 CJ est. value
Seguin, TX 78155

November 2021 Bond Program/
New Construction, Infrastructure
Post-Bid
$80,000,000 CJ est. value
Seguin, TX 78155

Road Ranger #285 / Seguin
New Construction, Infrastructure - 12,676 SF
Post-Bid
$2,100,000 CJ est. value
Seguin, TX 78155

Carrizo Groundwater Supply Project Wellfield and Transmission Main Surface Facilities
Infrastructure
Results
$32,494,508 CJ est. value
Seguin, TX 78155

Carrizo Groundwater Supply Project Wellfield and Transmission Main Surface Facilities
Infrastructure
Results
$32,494,508 CJ est. value
Seguin, TX 78155

Widen Road - Add Lanes - IH 10
Infrastructure
Construction
$125,021,001 CJ est. value
Seguin, TX 78155

Dutch Bros Coffee / Seguin
New Construction, Infrastructure - 950 SF
Construction
$650,000 CJ est. value
Seguin, TX 78155

Starbucks - I-35 & North Walters Street
New Construction, Infrastructure - 2,556 SF
Pending Verification
$474,450 CJ est. value
Schertz, TX 78154

Doss Audiology / Schertz Parkway
New Construction, Infrastructure - 2,000 SF
Pending Verification
$175,000 CJ est. value
Schertz, TX 78154

FM 1103
Infrastructure
Conception
$33,711,690 CJ est. value
Cibolo, TX 78108

H-E-B Fulfillment Center / Cibolo
New Construction, Infrastructure - 55,000 SF
Design
$15,000,000 CJ est. value
Cibolo, TX 78108

Last Updated 05/05/2023 12:31 PM
Project Title

Construction Package No.1 - Wilcox Well #1

Physical Address View project details and contacts
City, State (County) Kingsbury, TX 78638   (Guadalupe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2020
Bids Due View project details and contacts
Estimated Value $325,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This construction package consists of drilling and developing Wilcox Water Well No. 1, including pressure cementing, video survey, 36-hour pump test, water quality sampling, downhole equipment, vertical turbine pump and well head completion for Crystal Clear Special Utilities District. The project also consists of clearing and grubbing the water well area and fence lines along the edge of the property and installing barbed wire fence and gates. All questions about the meaning or intent of the Bidding Documents shall be submitted in writing and must be received at least seven calendar days prior to the opening date. Proposals will be received for a single Contract. Proposals shall be provided on a unit price basis as indicated in the Bid Form. Crystal Clear Special Utility District expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities. The project will be awarded to the highest scoring respondent based on set evaluation criteria. A Respondent's failure to respond to the requested qualifications inquiry may result in the proposal being deemed non-responsive. Proposals may be held by Crystal Clear Special Utility District for a period not to exceed 60 days from the date of bid opening for the purpose of reviewing the proposals and evaluating respondent's qualifications prior to the contract award. This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Request for Proposals (RFP) are expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees, are or will be a party to this RFP or any resulting contract. Any contract(s) awarded under this RFP is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and Section 1452(a)(4) of the Safe Drinking Water Act (42 U.S.C. 300j-12(a)(4)), as applicable. This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned business Enterprise (M/WBE) business. EPA rules require that applicants and prime contractors make a good faith effort toward a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. For more details of the DBE Program and the current, applicable, fair share goals. Equal Employment Opportunity and Affirmative Action- All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Any contract awarded under the RFP will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors--Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order No. 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. Davis-Bacon prevailing wage requirements apply. A bid bond in the amount of five percent (5%) of the bid issued by an acceptable surety shall be submitted with each proposal. The successful respondent will be required to furnish a Performance Bond and a Payment Bond, each in the amount of the contract, written by a responsible Surety Company, authorized to do business in the State of Texas. MBE :19.44% WBE : 9.71%

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents