Similar Projects
Wildhorse Ranch Wastewater Treatment Plant Expansion
Addition
Conception
$35,000,000 est. value
Austin, TX 78653

Dessau Wastewater Treatment Plant Capacity Expansion
Addition
Conception
$8,650,000 est. value
Austin, TX

Wilbarger Creek Wastewater Treatment Facility
New Construction
Design
Pflugerville, TX

Bluffington #2 Lift Station
Renovation
Design
$10,000,000 CJ est. value
Austin, TX 78746

Flintrock Effluent Improvements Phase I
Demolition, New Construction, Infrastructure
Bidding
$474,000 CJ est. value
Lakeway, TX 78734

Travis County W.C.and I.D. Point Venture WTP Generator
Renovation
Bidding
$352,000 CJ est. value
Lago Vista, TX 78645

Glenlake Pump Station Bypass Improvements
Post-Bid
$865,000 est. value
Austin, TX 78730

Turner`s Crossing Booster Pump Station
New Construction
Post-Bid
Buda, TX

North Waste Water Treatment Plant Headworks Replacement Project
Results
Austin, TX

West Bee Cave Pump Station Upgrades
Results
$172,000 est. value
Bee Cave, TX

Walnut Creek Wastewater Treatment Plant - City of Austin
Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Austin, TX 78724

Boggy Creek East Lift Station
Renovation
Pending Verification
$13,800,000 CJ est. value
Austin, TX 78725

South Austin Regional WWTP Trains A & B Improvements
Renovation
Conception
$78,230,000 est. value
Austin, TX 78799

Bend O'River Lift Station
Renovation
Design
$10,000,000 CJ est. value
Austin, TX 78746

Sunfield-Subaru Public Improvements
Infrastructure
Post-Bid
Buda, TX 78610

Last Updated 10/10/2022 01:33 PM
Project Title

Walnut Creek Wastewater Treatment Plant (WWTP) Influent Lift Station - 3023.059 - City of Austin

Physical Address View project details and contacts
City, State (County) Austin, TX 78724   (Travis County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $12,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a lift station dedicated to the Johnny Morris Interceptor, leaving the Raw Water Pump Station inside Walnut Creek Wastewater Treatment Plant for process flows and plant drains only. The project is included in the city's 2023-2027 capital improvement plan (CIP). As of October 10, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents