Similar Projects
Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Streambank Stabilization - Middle Rouge River (Near Meadowbrook Lake) - 133-08
Alteration
Conception
$1,469,656 est. value
Novi, MI

Novi Medical Building
New Construction, Infrastructure - 2,558 SF
Design
$1,486,198 CJ est. value
Novi, MI 48377

Bebb Oak Meadows Mixed-Use
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Rochester Hills, MI 48307

2023 Water Main Improvements
Infrastructure
Bidding
$1,400,000 CJ est. value
Royal Oak, MI 48067

Lagoon and Point Street Sanitary Sewer
Infrastructure
Bidding
$221,000 CJ est. value
Commerce Township, MI 48382

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Farmington High School Site and Building Improvements
Infrastructure
Post-Bid
Farmington, MI 48336

West Bloomfield Civic Center Emergency Access Drive Project
Results
$143,536 est. value
MI 48323

Cemetery and Volunteer Park Grading Project
Results
$115,000 est. value
South Lyon, MI

La Salette Multi-Family Development - The Ivy
Infrastructure, Renovation - 22,923 SF
Construction
$5,000,000 CJ est. value
Berkley, MI 48072

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Zeenat Plaza
New Construction, Infrastructure - 21,421 SF
Pending Verification
$11,000,000 CJ est. value
Rochester Hills, MI 48307

Orchard Lake Road Mixed-Use / Keego Harbor
New Construction, Infrastructure - 15,000 SF
Conception
$95,000,000 CJ est. value
Keego Harbor, MI 48320

Camden Crossing Condos
New Construction, Infrastructure
Design
$9,500,000 CJ est. value
Rochester Hills, MI 48309

Last Updated 01/13/2023 10:09 AM
Project Title

Quaker Valley Road Culverts Reconstruction Project

Physical Address View project details and contacts
City, State (County) Farmington Hills, MI 48331   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,954,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Quaker Valley Road Culverts Reconstruction Project. Buyers Requirements General Requirements - FOB Destination - Insurance Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 25 % - Labor and Materials Bond 100 % Questions are submitted online No 11360807 - DESIGN NUMBER. 1061329211 - NOTIFICATION NUMBER. Project Number 191579. Project questions should be directed to Tyler Sonoga, Civil Engineer at tsonoga@fhgov.com. Michelle Aranowski, Senior Buyer, can answer general questions maranowski@fhgov.com. Other than seasonal restoration items, the entire project must be complete, and Quaker Valley Road must be restored to two lanes, no later than November 24, 2023. Punchlist items shall be completed within two (2) weeks of procurement by the Engineer. If you have any questions regarding this letter, please contact me at 586-256-7273; DurackP@Michigan.gov; or EGLE, Water Resources Division, Warren District Office, 27700 Donald Court, Warren, Michigan 48092-2793. Please include your Permit Number WRP017896 in your response.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents