Similar Projects
Menards / Bradley
New Construction, Infrastructure - 200,000 SF
Design
$25,000,000 CJ est. value
Bradley, IL 60915

Menards / Bradley
New Construction, Infrastructure - 200,000 SF
Design
$25,000,000 CJ est. value
Bradley, IL 60915

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Water Main Improvements
Infrastructure
Post-Bid

South Schuyler Avenue Bike and Pedestrian Roadway Improvement
Infrastructure
Post-Bid
Kankakee, IL

Bituminous Seal Coat HFE-150: 3,031.0 Gal; Seal Coat Aggregates (CA-16): 108.0 Ton
Infrastructure
Results
Bonfield, IL

IVHM FY22 Concrete
Alteration
Results
Manteno, IL 60950

2022 MFT Street Maintenance Program
Infrastructure
Bidding
$400,000 CJ est. value
Kankakee, IL 60901

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
Kankakee, IL

Bituminous Surface Treatment
Infrastructure
Results
Bourbonnais, IL

Resurfacing CH 18
Infrastructure
Bidding
$4,000,000 CJ est. value
Essex Township, IL 60961

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Seal Coat
Infrastructure
Results
Union Hill, IL

Roadside Restoration of Right-of-Way Turf Damage
Infrastructure
Bidding
$200,000 CJ est. value
Bourbonnais, IL 60914

Last Updated 01/03/2023 09:07 AM
Project Title

Milling and Resurfacing With a Designed Overlay of IL 115 Including Drainage and ADA Improvements

Physical Address View project details and contacts
City, State (County) Kankakee, IL 60901   (Kankakee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,189,960 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work begins on IL 115 1/3 miles north of Gar Creek in southwest Kankakee and ends at the intersection of S Washington Avenue and W Jeffery Street in Kankakee. The project is a milling and resurfacing with a designed overlay of IL 115 including drainage and ADA improvements. Region 2 District 3 Federal Project # STP76YQ(861) County(s) Kankakee Key Route(s) FAU 6188 FAS 1323 Marked Route(s) IL 115 Section(s) (39C)RS-5 State Job #(s) C-93-032-16 PPS #(s) 3-11546-0400 VBP% 0.00 Completion Date : 60 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 023 - Milling and Resurfacing With a Designed Overlay of IL 115 Including Drainage and ADA Improvements

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents