Project Title | Runway 13/31 Rehabilitation and Lighting Improvements |
Physical Address | View project details and contacts |
City, State (County) | Aberdeen, SD 57401 (Brown County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Runways/Taxiways, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,446,050 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bid Schedule A - Runway 13/31 Rehabilitation Primary Work: 16290 SqYd of Asphalt Pavement Removal (4" Nominal Depth), 2140 SqYd Concrete Pavement Removal (13" Nominal Depth), 69420 Ft of Joint Sealant Removal, 290 CuYd of Crushed Aggregate Base Course, 18430 SqYd of Scarify, Reshape, and Recompact Existing Base, 4030 Ton of Asphalt Base/Surface Course, 250 Ton of Asphalt Binder (PG 64-34), 2140 SqYd of 13" Cement Concrete Pavement, 21 Ton of Emulsified Prime Coat, 7 Ton of Emulsified Tack Coat, 64970 Ft of Silicone Joint Sealant, 11730 Ft of Hot Pour Joint Sealant, 4450 Ft of Saw and Seal Cracks, 1670 SqYd of Saw-Cut Grooving, 650 Ft of Crack Stitching, 300 SqFt of Concrete Spall Repair, Marking Surface Preparation, Contractor Quality Control Program, and other items of related construction. Bid Schedule A1 - Grading & Restoration Primary Work: 2180 CuYd of Unclassified Excavation, 1090 CuYd of Disposal of Excess Material, 13040 SqYd of Seeding and Fertilizing, 1090 CuYd of Topsoil (Obtained on Site), 1090 CuYd of Topsoil (Obtained From Off the Site), 13040 SqYd of Mulching, and other items of related construction. Bid Schedule A2 - Pavement Marking Primary Work: Surface Preparation, Pavement Marking, and other items of related construction. Bid Schedule B - Runway 13/31 Rehabilitation Primary Work: 1 Each Remove & Dispose of Existing Primary Wind Cone & Footing, 1 Each Remove & Dispose of Existing Supplemental Wind Cone, 1 Each L-807, Style 1A or 1B, Size 2, Lighted LED Wind Cone, Including Footing & Site Pad, Complete, 1 Each L-806, Style 1A or 1B, Size 1, Lighted LED Wind Cone, Installed on Existing Footing, Complete, 16600 Ft of 1/C No. 8 AWG, 5kV, L-824, Type C Cable, Installed in Conduit, 630 Ft of 1/C No. 10 AWG, 600V THWN-2 Cable, Installed in Conduit, 310 Ft of 1/C No. 10 AWG, 600V THWN-2 Cable (GND), Installed in Conduit, 1820 Ft of 1/C No. 6 AWG, Solid, Bare Copper Counterpoise Wire, Including Trenching or Plowing, Including Ground Rods, Connections & Terminations, 340 Ft of Remove & Dispose of Existing Conduit, 14900 Ft of Remove & Dispose of Existing Cable, 2540 Ft of Trenching & Backfilling or Plowing for Conduit, 1680 Ft of Non-Encased, Electrical Conduit, 1-Way, 2-Inch, Type I, Sch. 40 PVC in Trench or SDR 13 HDPE Plowed, 30 Ft of Non-Encased, Electrical Conduit, 1-Way, 2-Inch, Type III, SDR 11 HDPE Bored, 30 Ft of Sand Encased, Electrical Conduit, 1-Way, 2-Inch Type III, Sch. 80 PVC in Trench, 350 Ft of Sand Encased, Electrical Conduit, 6-Way, 2-Inch Type III, Sch. 80 PVC in Trench, 200 Ft of Sand Encased, Electrical Conduit, 7-Way, 2-Inch Type III, Sch. 80 PVC in Trench, 280 Ft of Sand Encased, Electrical Conduit, 8-Way, 2-Inch Type III, Sch. 80 PVC in Trench, 30 Each of Cable Markers, 78 Each of Remove and Dispose of Existing Runway Light, 5 Each of Remove & Dispose of Existing L-858 Distance Remaining Sign, 1 Set of Remove & Dispose of Existing L-849 REIL & Footing, 1 Set of Remove & Dispose of Existing L-880 PAPI & Footing, 1 Each of L-850C, Flush Mounted, Class 2, Mode 1, Style 3, LED, High Intensity Runway Light (HIRL), w/ Artic Kits, White-White, Installed on Existing Base Can, 1 Each of L-850C, Flush Mounted, Class 2, Mode 1, Style 3, LED, High Intensity Runway Light (HIRL), w/ Artic Kits, White-Yellow, Installed on Existing Base Can, 27 each of L-862, 30-Inch Elevated, Mode 1, LED, High Intensity Runway Light (HIRL), w/ Artic Kits, White-White, Installed on Existing Base Can, 37 Each of L-862, 30-Inch Elevated, Mode 1, LED, High Intensity Runway Light (HIRL), w/ Artic Kits, White-Yellow, Installed on Existing Base Can, 16 Each of L-862SE, 30- Inch Elevated, Mode 1, LED, High Intensity Runway Light (HIRL), w/ Artic Kits, Red-Green, Installed on Existing Base Can, 5 Each of L-858B Distance Remaining Sign, Size 4, Style 3, Class 2, Mode 2, Lighted, LED, Including Site Pad, 1 Set of L-849I Runway End Identifier Light (REIL), LED, Style E, Including Footing & Site Pad, Complete, 1 Set of L-880 Precision Approach Path Indicator (PAPI), LED, Style A, Class 2, 3-Leg Mount, Including Footing & Site Pad, Complete, Temporary Phasing, Spare Parts, and other items of related construction. Each bid must be accompanied by a certified check, cashier's check or draft in the amount of five percent (5%) of the total bid, and drawn on a solvent State or National Bank, or a ten percent (10%) Bid Bond issued by a surety authorized to do business in the State of South Dakota and payable to the City of Aberdeen, South Dakota.. Separate Payment and Performance Bonds guaranteeing faithful performance of the Contract and payment of all labor, materials, rentals, etc., will be required for an amount equal to one hundred percent (100%) of the amount of the Contract. All bonds must be issued or co-signed by a licensed resident agent of South Dakota. The right is reserved, as the interest of the City of Aberdeen, South Dakota, may require, to reject any and all bids, to waive informality in bids received, and to accept or reject any items of any bid, unless such bid is qualified by specific limitation. A Pre-Bid Conference is intended to clarify any questions regarding bidding and/or construction requirements |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |