Similar Projects
Shoulder Widening, Replace Str RCBC, Approach Grading, Modify Intersection, Pipe Work; Signal
Infrastructure
Conception
$19,197,000 CJ est. value
Frederick, SD 57441

Shoulder Widening, Replace Str RCBC, Approach Grading, Modify Intersection, Pipe Work; Signal
Infrastructure
Conception
$19,197,000 CJ est. value
Frederick, SD 57441

Water System Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Stratford, SD 57474

Water System Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Stratford, SD 57474

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

North Dakota Street Roadway Improvements
Infrastructure
Post-Bid
Aberdeen, SD 57401

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Rout and Seal
Infrastructure
Results

New County Jail - County of Brown
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Aberdeen, SD 57401

Water Reclamation Plant Expansion - City of Aberdeen
Renovation, Infrastructure
Pending Verification
$56,300,000 CJ est. value
Aberdeen, SD 57401

Install Adaptive Signal Control System
Infrastructure
Conception
$1,144,000 CJ est. value
Aberdeen, SD 57401

Mill and Overlay Improvements
Infrastructure
Bidding
$716,000 CJ est. value
Aberdeen, SD 57401

Richmond Dam Spillway Replacement
Infrastructure
Post-Bid
$5,500,000 CJ est. value
Aberdeen, SD 57401

2022 Miscellaneous Asphalt and Concrete Improvements and Lincoln Elementary School Parking Lot Construction
Infrastructure
Results
$300,000 est. value
Aberdeen, SD 57401

10th Avenue Southeast Bridge Replacement- City of Aberdeen
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Aberdeen, SD 57401

Last Updated 04/27/2023 09:13 AM
Project Title

Runway 13/31 Rehabilitation and Lighting Improvements

Physical Address View project details and contacts
City, State (County) Aberdeen, SD 57401   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,446,050 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Schedule A - Runway 13/31 Rehabilitation Primary Work: 16290 SqYd of Asphalt Pavement Removal (4" Nominal Depth), 2140 SqYd Concrete Pavement Removal (13" Nominal Depth), 69420 Ft of Joint Sealant Removal, 290 CuYd of Crushed Aggregate Base Course, 18430 SqYd of Scarify, Reshape, and Recompact Existing Base, 4030 Ton of Asphalt Base/Surface Course, 250 Ton of Asphalt Binder (PG 64-34), 2140 SqYd of 13" Cement Concrete Pavement, 21 Ton of Emulsified Prime Coat, 7 Ton of Emulsified Tack Coat, 64970 Ft of Silicone Joint Sealant, 11730 Ft of Hot Pour Joint Sealant, 4450 Ft of Saw and Seal Cracks, 1670 SqYd of Saw-Cut Grooving, 650 Ft of Crack Stitching, 300 SqFt of Concrete Spall Repair, Marking Surface Preparation, Contractor Quality Control Program, and other items of related construction. Bid Schedule A1 - Grading & Restoration Primary Work: 2180 CuYd of Unclassified Excavation, 1090 CuYd of Disposal of Excess Material, 13040 SqYd of Seeding and Fertilizing, 1090 CuYd of Topsoil (Obtained on Site), 1090 CuYd of Topsoil (Obtained From Off the Site), 13040 SqYd of Mulching, and other items of related construction. Bid Schedule A2 - Pavement Marking Primary Work: Surface Preparation, Pavement Marking, and other items of related construction. Bid Schedule B - Runway 13/31 Rehabilitation Primary Work: 1 Each Remove & Dispose of Existing Primary Wind Cone & Footing, 1 Each Remove & Dispose of Existing Supplemental Wind Cone, 1 Each L-807, Style 1A or 1B, Size 2, Lighted LED Wind Cone, Including Footing & Site Pad, Complete, 1 Each L-806, Style 1A or 1B, Size 1, Lighted LED Wind Cone, Installed on Existing Footing, Complete, 16600 Ft of 1/C No. 8 AWG, 5kV, L-824, Type C Cable, Installed in Conduit, 630 Ft of 1/C No. 10 AWG, 600V THWN-2 Cable, Installed in Conduit, 310 Ft of 1/C No. 10 AWG, 600V THWN-2 Cable (GND), Installed in Conduit, 1820 Ft of 1/C No. 6 AWG, Solid, Bare Copper Counterpoise Wire, Including Trenching or Plowing, Including Ground Rods, Connections & Terminations, 340 Ft of Remove & Dispose of Existing Conduit, 14900 Ft of Remove & Dispose of Existing Cable, 2540 Ft of Trenching & Backfilling or Plowing for Conduit, 1680 Ft of Non-Encased, Electrical Conduit, 1-Way, 2-Inch, Type I, Sch. 40 PVC in Trench or SDR 13 HDPE Plowed, 30 Ft of Non-Encased, Electrical Conduit, 1-Way, 2-Inch, Type III, SDR 11 HDPE Bored, 30 Ft of Sand Encased, Electrical Conduit, 1-Way, 2-Inch Type III, Sch. 80 PVC in Trench, 350 Ft of Sand Encased, Electrical Conduit, 6-Way, 2-Inch Type III, Sch. 80 PVC in Trench, 200 Ft of Sand Encased, Electrical Conduit, 7-Way, 2-Inch Type III, Sch. 80 PVC in Trench, 280 Ft of Sand Encased, Electrical Conduit, 8-Way, 2-Inch Type III, Sch. 80 PVC in Trench, 30 Each of Cable Markers, 78 Each of Remove and Dispose of Existing Runway Light, 5 Each of Remove & Dispose of Existing L-858 Distance Remaining Sign, 1 Set of Remove & Dispose of Existing L-849 REIL & Footing, 1 Set of Remove & Dispose of Existing L-880 PAPI & Footing, 1 Each of L-850C, Flush Mounted, Class 2, Mode 1, Style 3, LED, High Intensity Runway Light (HIRL), w/ Artic Kits, White-White, Installed on Existing Base Can, 1 Each of L-850C, Flush Mounted, Class 2, Mode 1, Style 3, LED, High Intensity Runway Light (HIRL), w/ Artic Kits, White-Yellow, Installed on Existing Base Can, 27 each of L-862, 30-Inch Elevated, Mode 1, LED, High Intensity Runway Light (HIRL), w/ Artic Kits, White-White, Installed on Existing Base Can, 37 Each of L-862, 30-Inch Elevated, Mode 1, LED, High Intensity Runway Light (HIRL), w/ Artic Kits, White-Yellow, Installed on Existing Base Can, 16 Each of L-862SE, 30- Inch Elevated, Mode 1, LED, High Intensity Runway Light (HIRL), w/ Artic Kits, Red-Green, Installed on Existing Base Can, 5 Each of L-858B Distance Remaining Sign, Size 4, Style 3, Class 2, Mode 2, Lighted, LED, Including Site Pad, 1 Set of L-849I Runway End Identifier Light (REIL), LED, Style E, Including Footing & Site Pad, Complete, 1 Set of L-880 Precision Approach Path Indicator (PAPI), LED, Style A, Class 2, 3-Leg Mount, Including Footing & Site Pad, Complete, Temporary Phasing, Spare Parts, and other items of related construction. Each bid must be accompanied by a certified check, cashier's check or draft in the amount of five percent (5%) of the total bid, and drawn on a solvent State or National Bank, or a ten percent (10%) Bid Bond issued by a surety authorized to do business in the State of South Dakota and payable to the City of Aberdeen, South Dakota.. Separate Payment and Performance Bonds guaranteeing faithful performance of the Contract and payment of all labor, materials, rentals, etc., will be required for an amount equal to one hundred percent (100%) of the amount of the Contract. All bonds must be issued or co-signed by a licensed resident agent of South Dakota. The right is reserved, as the interest of the City of Aberdeen, South Dakota, may require, to reject any and all bids, to waive informality in bids received, and to accept or reject any items of any bid, unless such bid is qualified by specific limitation. A Pre-Bid Conference is intended to clarify any questions regarding bidding and/or construction requirements

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents