Similar Projects
WY Flap 407(1) Kortes Road
Term Contract
Bidding
Alcova, WY

Milling Plant Mix, Bituminous Pavement Surfacing (Recycle), Fencing and Miscellaneous
Infrastructure
Bidding
WY

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Grading, Placing Crushed Base and Bituminous Pavement Surfacing, Removal and Replacement Of Structure, Sidewalk (Conc), Guardrail and Miscellaneous
Infrastructure
Bidding
Cheyenne, WY 82008

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

Milling Plant Mix, Bituminous Pavement Surfacing (Recycle), Chip Seal and Miscellaneous
Infrastructure
Bidding
Atlantic City, Jeffrey City, WY 82520

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

Grading, Milling Plant Mix, Placing Crushed Base and Bituminous Pavement Surfacing (Recycle), Chip Seal and Miscellaneous
Infrastructure
Bidding
WY

Sweetwater Jct. - Riverton (Beaver Rim South & Middle Section)
Infrastructure
Results
Riverton, WY

Grading, Placing Pit Run Subbase and Bituminous Pavement Surfacing, Chip Seal, Fencing and Miscellaneous
Infrastructure
Bidding
WY

Cheyenne Streets - Warren Ave (Lincolnway - 24th)
Infrastructure
Results
Cheyenne, WY

Grading, Concrete Slab Replacement, Bridge Rehabilitation, Temporary Concrete Barrier and Miscellaneous
Infrastructure
Bidding
WY

Greybull - Lovell (US 310 / WYO 789)
Infrastructure
Results
Greybull, Lovell, WY

Crack Seal
Infrastructure
Results

Last Updated 10/18/2021 03:11 AM
Project Title

District 3 Crack Seal

Physical Address View project details and contacts
City, State (County) (Lincoln, Sublette, Sweetwater, Uinta Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Crack sealing and miscellaneous work on approximately 104.70 miles at various locations in Transportation District 3 in Lincoln, Sublette, Sweetwater & Uinta Counties Stp-Pm-b223027: 5 - Roadway Description: # Item Description Quantity Unit 1 109.04000 Force Account Work 5,000.000 $$ 2 109.08000 Mobilization 1.000 Ls 3 215.01000 Contractor Storm Water Control 1.000 Ls 4 403.05050 Crack Seal (Plant Mix) 635,000.000 Lb 5 703.03100 Flagging 700.000 Hr 6 703.03110 Temporary Traffic Control 1.000 Ls 7 703.03200 Sequential Chevron 1.000 Ls

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents