Similar Projects
Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

South Fork Skagit River Floodplain Restoration
Infrastructure
Post-Bid
$2,000,000 to $2,250,000 est. value
Mount Vernon, WA 98274

SR 20 Skagit River Fish Passage
Infrastructure
Results
$4,000,000 to $4,500,000 est. value
WA

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

Darrington Wood Innovation Center
Infrastructure
Post-Bid
$9,650,000 est. value
Darrington, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

RFQ D/B - SR 20/Olson Creek and Unnamed Tributary to Skagit River - Fish Passage
Infrastructure
Bidding
$20,000,000 CJ est. value
Concrete, WA 98237

Shannon Point Marine Center (SPMC) Shoreline Improvements
Infrastructure
Results
$50,000 est. value
Anacortes, WA 98221

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Skagit Wildlife Area (WLA), Headquarters Unit Wiley Slough Spur Dike Repair
Infrastructure
Results
$170,000 est. value
Mount Vernon, WA 98273

Gossom On-site Septic System Installation
Infrastructure
Post-Bid
$100,000 CJ est. value
Sedro Woolley, WA 98284

SR 534/Unnamed Tributary to Carpenter Creek - Fish Passage
Alteration
Design
$2,602,000 est. value
WA

SR 530/Sauk River Roadway Embankment - Stabilization Top
Infrastructure
Design
$5,055,000 CJ est. value
Concrete, WA 98237

Lot 72 Sanitary Sewer and Waterline Relocation Project
Infrastructure
Bidding
$995,000 CJ est. value
Burlington, WA 98233

Last Updated 09/06/2022 04:04 AM
Project Title

I-5 / Maddox Creek - Fish Passage

Physical Address View project details and contacts
City, State (County) Mount Vernon, WA 98273   (Skagit County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction Documents, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $15,457,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID WA-07778 Remove the existing fish passage barrier and replace it with a fish passable structure. As of September 06, 2022, this project is in Design status. Preliminary engineering has begun and environmental design is expected to be completed in the fourth quarter of 2019. The contract advertisement is expected in fourth quarter of 2023 and construction is anticipated to be operationally complete in the fourth quarter of 2025. WSDOT - I-5 / Maddox Creek - Fish Passage *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents