Similar Projects
West Parking Garage
New Construction - 28,830 SF
Conception
$10,000,000 to $13,000,000 est. value
Buffalo, NY 14263

Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

Convent Gardens
New Construction
Design
$25,000,000 est. value
Hamburg, NY 14075

The Lawrence Apartments
New Construction - 176,600 SF
Design
$24,000,000 est. value
Buffalo, NY 14209

Subbasement Excavation for Steam Repairs
Term Contract, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Buffalo, NY 14215

Parking Lot Repairs Buffalo
Infrastructure
Bidding
$500,000 CJ est. value
Buffalo, NY 14215

Resurfacing of Various Streets 2021-2023
Term Contract, Infrastructure
Post-Bid
Mount Vernon, NY

Cazenovia Park Parkway Improvements, Group 993A
Infrastructure
Post-Bid
Buffalo, NY

Airport Pavement Maintenance 2021
Results
Less than $1,300,000 est. value
Cheektowaga, NY 14225

Young Street Corridor Improvements
Results
Less than $2,325,865 est. value
Tonawanda, NY

La Plaza Senior Residences
New Construction
Construction
$10,500,000 est. value
Buffalo, NY 14201

Sheffer Farms Townhouses Phase I
New Construction - 33,600 SF
Construction
$20,000,000 est. value
Orchard Park, NY 14127

Hope on Main
New Construction
Pending Verification
Buffalo, NY 14202

West Herr Automotive Group Car Dealership
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Hamburg, NY 14127

Georgian Townhomes
New Construction
Conception
$3,000,000 est. value
Buffalo, NY 14221

Last Updated 08/26/2022 04:33 PM
Project Title

Eagle Ridge - Phase 1

Physical Address View project details and contacts
City, State (County) Hamburg, NY 14075   (Erie County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Clubhouse/Social Club, Multi-Family Homes, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $48,000,000 [brand] Estimate
Plans Available from Design-Build Firm
Owner View project details and contacts
Architect View project details and contacts
Description

*As of August 26, 2022, all trades have been let. Project Start Date: - Site Work: September 2022 - Structures: November 2022 Proposed Completion Date: April 2024 Project Information: - (10) Two Unit Townhouse - (4) Eight Unit Building - (4) Twenty-six Unit Building - (1) Club House (Drawings TBD) - (1) Maintenance Garage (Drawings TBD) - (1) Trash Compacter - (7) Five Car Garage (Drawings TBD)

Details

New Construction, New Construction. Parking Spaces, 35 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents