Last Updated | 02/14/2023 07:09 AM |
Project Title | RFQ Construction Manager at Risk - Construction Manager-at-Risk services for Workforce and Allied Health Training Center for Lamar Institute of Technology |
Physical Address | View project details and contacts |
City, State (County) | Beaumont, TX 77705 (Jefferson County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural, Engineering |
Contracting Method | Competitive Bids |
Project Status | Request for Qualifications, Design Development, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $27,813,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of October 20, 2022, the owner has selected a Construction Manager. A timeline for construction has not yet been established. The new Workforce and Allied Health Training Center is envisioned as a two-story building with an embedded high-bay instructional space. The first floor will be a welcoming space with the main building lobby and student lounge. It will also include the majority of the workforce instructional space and simulation suite. The second floor will be dedicated to allied health and contain the skills labs, pharmacy technician labs, and main testing room. The new center will provide key capabilities for expanding workforce offerings, and the proposed allied health nursing program. The proposed building is intended to be oriented east-west on the site with its main public academic entry access from the western side, near the quad, and the industry partner entry to the eastern side. The site organization biases placing the more technical spaces, such as the industry flex closer to the southeast corner, and the general instructional spaces near the building entrance. The building lobby is envisioned as a two-story volume space. A unique feature discussed in programming is the ability to look down into the industry flex lab from the second floor. Payment and Performance Bonds The Owner designates the following person as its representative and Point-of-Contact for this RFQ/P. Respondents shall restrict all contact with the Owner and direct all questions regarding this RFQ/P, including questions regarding terms and conditions, in writing to the Point-of-Contact person, via email only. Sheryll Snider, Director for Purchasing and Contracts Email: spsnider@lit.edu RFQ/P submittal of questions deadline (12:00 p.m.)..........................................08/04/2022 The Owner designates the following person as its representative and Point-of-Contact for this RFQ/P. Respondents shall restrict all contact with the Owner and direct all questions regarding this RFQ/P, including questions regarding terms and conditions, in writing to the Point-of-Contact person, via email only. Sheryll Snider, Director for Purchasing and Contracts Email: spsnider@lit.edu Interview of shortlisted Respondent (if required)...............................................09/08/2022 Owner selects CMR ...........................................................................................09/09/2022 Notice to Proceed for Pre-Construction Services ...............................................09/26/2022 Total Construction Duration: (Notice to Proceed for Construction, April 17, 2023, to Substantial Completion, June 28, 2024): 438 Days / 14.4 Months. Liquidated Damages: Liquidated Damages as defined by the Contract are set at Two Thousand Dollars ($2,000) per calendar day. Final Completion ...............................................................................................07/26/2024 Occupancy .........................................................................................................07/29/2024 The schedule of events presented above represent a basic timeline for the project. A final project timeline will be developed with the Owner at a later time. The Owner can be expected to work with the A/E and the CMR to validate and improve on this initial schedule. TOTAL CONSTRUCTION DURATION: (Notice to Proceed for Construction, April 17, 2023, to Substantial Completion, June 28, 2024): 438 Days / 14.4 Months. |
||||||||||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, New Construction, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |