Similar Projects
Cooper's Hawk Winery & Restaurant / Bloomingdale
Renovation - 22,000 SF
Conception
$3,000,000 est. value
Bloomingdale, IL 60108

Fire Station #13 - C012 - City of Aurora
New Construction, Infrastructure
Conception
$6,500,000 CJ est. value
Aurora, IL 60502

Culver's
New Construction, Build-Out - 4,800 SF
Design
$1,000,000 est. value
Bloomingdale, IL 60108

Market Meadows Shopping Center Redevelopment
New Construction, Renovation - 157,919 SF
Design
$14,000,000 est. value
Naperville, IL 60540

DBD Traffic Signal and Accesibility
Infrastructure
Bidding
$980,000 CJ est. value
Downers Grove, IL 60515

North Grace Street Utility Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Lombard, IL 60148

Building Demolition and Site Restoration
Demolition
Post-Bid
West Chicago, IL 60185

Circle Park FY2021 Site Improvements
Infrastructure
Post-Bid
Bloomingdale, IL

White Pines Golf Club Driving Range
Infrastructure
Results
Bensenville, IL 60106

2022 Site Improvements
Infrastructure
Results
Willowbrook, IL 60527

Naperville Crossings Building 7
New Construction - 4,768 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Naperville, IL 60564

Mix Used & Mixed Tenant Commercial Buildings
New Construction, Renovation - 162,363 SF
Construction
$4,900,000 est. value
Hanover Park, IL 60133

Dunkin` Donuts
New Construction - 2,800 SF
Pending Verification
Itasca, IL 60143

The Matrix Club
Build-Out
Pending Verification
Naperville, IL 60540

St James Farm Near Warrenville - DuPage County
Infrastructure
Conception
$300,000 CJ est. value
Warrenville, IL 60555

Last Updated 01/06/2023 02:01 PM
Project Title

Chicken Salad Chick / Fox Valley

Physical Address View project details and contacts
City, State (County) Aurora, IL 60504   (DuPage County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2024
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 6, 2023, this project is in planning. Information regarding a general contractor or the method of selection thereof has not been established at this time. No construction timeline has been established at this time; however, this location is planned to open by late 2024.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents