Similar Projects
Airport Airfield, Terminals, Ground Access Infrastructure
Renovation, Alteration
Conception
San Antonio, TX

Clark High School - Fine Arts Replacement- 2022 Bond - Northside Independent School District
New Construction, Renovation, Infrastructure
Conception
$56,900,000 CJ est. value
San Antonio, TX 78249

Chick-fil-A #2632
Renovation - 1,865 SF
Design
San Antonio, TX 78209

Wendy's #1044 Refresh
Renovation - 2,867 SF
Design
San Antonio, TX 78219

Hill Country High School
New Construction, Infrastructure - 64,000 SF
Bidding
$22,000,000 CJ est. value
San Antonio, TX 78254

Women's & Children's Hospital Tower - Kitchen, Servery Dining & Conference Finish Out Package 10
Build-Out
Post-Bid
est. value
San Antonio, TX 78229

2018 Street Bond Projects - Phase II
Infrastructure
Post-Bid
$1,900,000 CJ est. value
Kirby, TX 78219

VMC Asphalt Parking Lots Improvements
Results
San Antonio, TX 78212

Somerset K - Street Phase II Reconstruction
Results
$268,298 est. value
Somerset, TX 78069

Domino's Pizza
Build-Out - 1,700 SF
Construction
San Antonio, TX 78228

Twin Peaks
New Construction - 8,100 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Live Oak, TX 78233

Alamo Visitor Center and Museum
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
San Antonio, TX 78205

Alamo Visitor Center and Museum
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
San Antonio, TX 78205

Slim Chickens
New Construction
Conception
San Antonio, TX 78254

Black Rock Coffee
Build-Out - 2,771 SF
Design
$250,000 est. value
San Antonio, TX 78233

Last Updated 02/10/2023 02:07 PM
Project Title

Dutch Bros Coffee TX2305 - Potranco Road / San Antonio

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78245   (Bexar County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status All Bids Received, Selection Underway, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Building consists of one drive-thru service window and one walk-up service window; no indoor access to customers is provided. Site plan development includes small parking area, two drive-thru stacking lanes, a trash enclosure. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

1 Story Above Grade, 950 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents