Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Post-Bid
Less than $1,158,847 est. value
Jacksonville, FL 32099

Construct North 7th Street Sidewalk
Term Contract
Post-Bid
Lantana, FL 33462

SW 27th Multi-Use Path
Results
Less than $367,000 est. value
Gainesville, FL

Advanced Traffic Management System (ATMS), Implementation and Maintenance Services
Results
FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Salt Lake (Entry Improvements)
Post-Bid
Less than $75,000 est. value
Mims, FL 32754

Advanced Traffic Management System (ATMS)
Results
Tampa, FL 33601

APL Traffic Equipment
Term Contract
Post-Bid
Tallahassee, FL 32300

Automated Traffic Signal Performance Measures (ATSPMs) Equipment
Term Contract
Results
Boca Raton, FL

City of Plant City Sidewalk Improvements
Post-Bid
Plant City, FL 33564

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

Traffic Monitoring Camera 2019A
Post-Bid
Port Saint Lucie, FL

City of Freeport - Pool Parking Lot Paving
Results
Less than $39,266 est. value
Freeport, FL

Concrete Horizontal Cutting on Public Walking Surfaces - ADA Compliance
Results
Less than $100,000 est. value
Tampa, FL 33601

Last Updated 07/29/2020 08:42 AM
Project Title

Low Bid Design Build SR 35 (US 17) From Hibiscus St to North of Palmetto St Desoto Co

Physical Address View project details and contacts
City, State (County) FL   (DeSoto County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposers for the SR 35 (US 17) from Hibiscus St to N of Palmetto St Lighting, Signalization and Mid-block crossings in Desoto County.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents