Similar Projects
Driveway Apron for Rainbow Lakes Substation
Bidding
Sumterville, FL

CDBG Repaving and Flood and Drainage Improvements
Results
Less than $566,054 est. value
Wildwood, FL 34785

CDBG Repaving and Flood and Drainage Improvements
Results
Less than $566,054 est. value
Wildwood, FL 34785

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Sumter County Buena Vista Boulevard Phase 2 Rehabilitation from 300 Feet South of Lake Miona to North of C-44A Roundabout
Results
Wildwood, FL 34785

Sumter County Morse Boulevard Phase 2 from 1,000 Feet South of Stillwater Trail to SR 44
Results
Less than $3,066,768 est. value
Wildwood, FL 34785

R-10 Effluent Storage Pond Lining
Results
$295,000 to $367,000 est. value
Wildwood, FL 34785

Sumter County C-466A Eastbound From Canal Street to Morse Boulevard
Results
Less than $459,977 est. value
Wildwood, FL 34785

Sumter County C-478 from US 301 to the City of Center Hill Southern Limits Resurfacing Project
Results
Less than $970,700 est. value
Wildwood, FL 34785

Sumter County C-478 Widening Between US 301 and SR 471
Results
Less than $4,498,933 est. value
FL

Walker Avenue, West Palm Avenue, and Jasper Street Overlay
Results
Less than $199,173 est. value
Bushnell, FL 33513

Resurfacing, Reconstruction, Widening
Results
Less than $2,025,463 est. value
FL

Emergency Roadside Assistance Services (I-75)
Results

Design Build Push Button Contract No. 2 – Program Management
Results

Asphalt Painting and Sealing - SECO HQ Building
Results
Sumterville, FL 33585

Last Updated 04/22/2020 12:45 PM
Project Title

25th Street Crossing Improvement Project

Physical Address View project details and contacts
City, State (County) FL   (Sumter County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $488,888
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the re-construction of the road crossing SE 25th Street and Jumper Creek. The work will include construction of concrete culverts, headwalls and end-walls, Flexamat slope protection, guardrail, pollution prevention control, and signage. The winning bidder shall construct the new crossing in accordance to the bid documents. One-way traffic and creek flow shall be maintained at all times during construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents